Download Print this page

OLT SSGS1216-FJ-Ply Assembly Manual page 24

12x16 sunshed garden shed with plywood roof

Advertisement

36.
Attach end Soffit Board flush to ends of outside Rafters with 2 - 1 1/4" screws per Rafter end.
Complete both outside Rafter/Soffit connections first. Measure and position interior Rafters as illus-
trated above. When positioned correctly, attach Soffits to remaining Rafters with 2 - 1 1/4"
screws/rafter. Important: Pilot Hole Soffits to prevent splitting.
45.5"
20.5"
20.5"
37.
Complete second Rafter section following Steps 34 - 36.
38.
With some helpers flip over each Rafter section so they can be lifted onto the shed. Soffits
should now be on the ground.Prepare to lift onto Wall and Gable Frame
Toll Free 1-888-658-1658
182"
45.5"
20.5"
20.5"
www.outdoorlivingtoday.com
Page 24
Important: Pilot
hole Soffit to prevent
splitting
45.5"
20.5"
20.5"
Soffits facing the ground
sales@outdoorlivingtoday.com
45.5"
20.5"
20.5"

Advertisement

loading

This manual is also suitable for:

Fj bevel