OLT SpaceSaver SS124-SLIDER-CEDAR-FJ Assembly Manual

12x4 sliding doors - cedar roof - fj siding

Advertisement

Quick Links

Stock Code:
SS124-SLIDER-CEDAR-FJ
Thank you for purchasing a
12x4 SpaceSaver Shed with
Sliding Doors. Please take the
time to identify all the parts prior
to assembly.
Safety Points and Other Considerations
Our products are built for use based on
proper installation on level ground and
normal residential use. Please follow the
instruction manual when building your
shed and retain the manual for future
maintenance purposes.
Customers are responsible for ensuring
a solid, level, well-draining site for
construction.
Please check with your local municipal
or county by-laws before ordering this
product to confirm it complies with
building codes.
In the event of a missing or broken piece, call the Outdoor Living Today Customer Support Line @ 1-888-658-1658 with-
in 30 days of the delivery of your purchase. It is our commitment to you to courier replacement parts, free of charge,
within 10 business days of this notification. Replacement parts will not be provided free of charge after the 30 day
grace period.
All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing
and workmanship. Costs incurred for customer installations are not included.
Failure to use supplied parts included in this kit could result in poor product performance and may void your warranty.
Please contact Outdoor Living Today's Customer Toll Free Line if you plan to deviate from our written instructions.
1-888-658-1658
12x4 SpaceSaver
Sliding Doors - Cedar Roof - FJ Siding
Assembly Manual
- Snow load ratings vary by geographical location. If heavy or wet snowfall occurs, it
is advisable to sweep snow off roof frequently.
- If the product is elevated, any structural and building code requirements are solely
the customer's responsibility, and should be abided by.
- In areas with high or gusty wind conditions, it is advisable to install the structure
securely to the ground.
- Have a regular maintenance plan to ensure screws, doors, windows and parts are
tightly affixed.
Customer agrees to hold Outdoor Living Today and any Authorized
Dealers free of any liability for improper installation, maintenance and
repair.
www.outdoorlivingtoday.com
Page 1
Version #1.3
September 10, 2021
sales@outdoorlivingtoday.com

Advertisement

Table of Contents
loading

Summary of Contents for OLT SpaceSaver SS124-SLIDER-CEDAR-FJ

  • Page 1 12x4 SpaceSaver Sliding Doors - Cedar Roof - FJ Siding Assembly Manual Version #1.3 Stock Code: September 10, 2021 SS124-SLIDER-CEDAR-FJ Thank you for purchasing a 12x4 SpaceSaver Shed with Sliding Doors. Please take the time to identify all the parts prior to assembly.
  • Page 2 What to do before my Shed arrives? • Become familiar with this assembly manual and determine if you can complete the project yourself or will require a professional contractor. • One helper is recommended to assist in constructing your shed. It generally takes two people over two days to assemble a shed.
  • Page 3 Foundation Types for 12x4 Garden Shed 141 1/2” 141 1/2” 45 1/2” 45 1/2” Concrete Foundation Floor Frame Completed Foundation Concrete Slab Foundation: - Slab must be at least the same size as assembled floor frame (45 1/2” x 141 1/2”) or larger. - 6”...
  • Page 4: Table Of Contents

    1. Floor Section Parts List - Pages 2 and 3 Steps Floors 1A: 2 - 45 ½” x 70 ¾” - Floor Frames 1B: 4 - 1 ½” x 3 ½” x 67 3/4” - Floor Joists 1C: 2 - 1 ½” x 3 ½” x 45 ½” - Floor Runners - Short 1CC: 5 - 1 ½”...
  • Page 5 4. Trim & Miscellaneous Section Cont. Steps Facia 56-60 4Q: 2 - ½” x 5 ½” x 54 1/8” - Side Facia (Angle Cut Ends) 4R: 4 - ½” x 5 ½” x 50 ½” - Front and Rear Facia - Left/Right 4S: 2 - ½”...
  • Page 6 Regular Maintenance & Tips to prolong the life of your shed. Before/During Assembly: 1.) Paint each face and edge of your plywood floor with a latex exterior paint. 2.) Caulk wall seams if gaps appear. 3.) Caulk around window framing. 4.) Caulk perimeter between floor plywood and bottom wall plate.
  • Page 7: Floor Section Steps

    1. Floor Section Exploded view of all parts necessary to complete Floor Section. Identify all parts prior to starting. Note: Floor Footprint is 141 1/2” wide x 45 1/2” deep. Floor Frames - 2pcs. Plywood Floor - 2pcs. (Part 1A) (Part 1D) Center Floor Joists - 4pcs.
  • Page 8: - 1 ½" X 3 ½" X 45 ½" - Floor Runners - Short

    Parts Hardware Position 1C - Floor Runners - Short on each 1C - Floor Runners - Short S1 - 2 1/2” Screws side of the completed floor frame. Runners should (1 1/2” x 3 1/2” x 45 1/2”) x 2 x 8 total be flush with corners but not overhanging.
  • Page 9: Wall Section Steps

    Advice: Use chalk line to mark location of mid joists for interior screws. Hardware With Plywood positioned correctly on floor framing, attach with 1 1/4” Screws. S2 - 1 1/4” Screws Use screws every 16” around perimeter of each floor section and 3 screws x 40 total (approx.) through each mid joists.
  • Page 10: - 45 ½" X 75" - Side/Rear Wall Panels

    Ensure bottom plate is flush side-to-side You can find BR1 - with wall studs Square Drive Bit for the screws in with the Hardware Kit Bag. Bottom Wall Plate Parts Hardware Carefully lay 2A - Side/Rear Wall Panels face 2A - Side/Rear Wall Panels S1 - 2 1/2”...
  • Page 11 Optional - Caulking seams will help prevent moisture from entering at seam. Caulking not Pilot Hole included in kit. first. Hardware (Steps 10 - 12) Position rear solid wall into place on plywood floor. Butt both vertical wall S1 - 2 1/2” Screws studs of side and rear walls together and attach with 3 - 2 1/2”...
  • Page 12 Wall panel will sit flush with floor framing. Do Not Attach Walls To Floor Until Step 23 Complete remaining side wall attachment as per Steps 10 - 11. Ensure bottom plate is flush side-to-side with wall studs Parts Carefully lay 2C - Front Wall Panels face down. Position and attach 2C - Front Wall Panels 2BB - Bottom Wall Plates to bottom of wall studs of each wall panel with (35”...
  • Page 13: Door Headers

    Step to front and top. Align flush Door Header outside with overhangs wall siding. inside wall framing by 1/2” Parts (Step 14 - 15) Hardware (Step 14 - 15) Position 2D - Door Header - Short on top 2D - Door Headers - Short S4 - 3”...
  • Page 14 Top Siding Pc. for Angle Wall Top Siding Pc. can also be installed after Roof is attached after Step 41. Parts Position 2F - Top Triangular Siding Piece onto 2G - Angle Wall Extenders - L/R 2G - Angle Wall Extender and align as shown above. Attach with (2G - 45 1/2”...
  • Page 15 Complete opposite Angled Wall Extender positioning and attachment as per Step 18. Cleat protects overhanging siding on upper walls from damage. Please remove before Protective installing. cleat Parts (Steps 20 - 21) Hardware (Steps 20 - 21) Place 2H - Rear Extender Walls top framing 2H - Rear Extender Walls S1 - 2 1/2”...
  • Page 16: - ¾" X 3 ½" X 84" - Horizontal Wall Cleat - Long

    Parts Attach 2I & 2J - Horizontal Wall Cleats to Wall Extender 2I - Horizontal Wall Cleat - Long bottom framing and Rear Wall top framing so that cleat is flush with (3/4” x 3 1/2” x 84”) x 1 extender framing.
  • Page 17: Rafter And Roof Section Steps

    3. Rafter and Roof Section Exploded view of all parts necessary to complete the Rafter and Roof Section. Identify all parts prior to starting. Filler Shingles - Rear Soffits - L/R Rear Soffit - Center Left Roof Panel 8pcs. (Part 3I) - 2pcs (Part 3D) - 1pc (Part 3E) (Part 3G)
  • Page 18: 3A - Rafters

    Note: We recommend you drill a 1/8” pilot hole for each screw, to avoid Screw Rear Soffits to splitting wood. The hole depth should be equal to 3/4 the length of screw. Rafters with 2 - 1 1/4” Screws per rafter end. Screw Front Soffits to Rafters with 2 - 2 1/2”...
  • Page 19 Rafter ends vertical. Side View Carefully flip completed Rafter Section over so Front Soffit is facing the front and place on SpaceSaver walls. Note: Double check that your Rafter Section is positioned correctly by ensuring the ends of the Rafters are sloped vertically as shown above. Rafter sits on framing Position completed Rafter Section on top of walls.
  • Page 20: - ¾" X ¾" X 51" - Facia Nailing Strips

    90° Metal Brackets Hardware With Rafter Section correctly aligned, secure rafters to walls using Y2 - 90° Metal Bracket 2 - 90° Metal Brackets per side. Attach each brackets with 4 - 1 1/4” Screws. x 4 total Screw into Wall Extension Framing at the rear and Wall Panel top framing at S2 - 1 1/4”...
  • Page 21 Front of plywood 1/8” recessed with rafter end. Plywood flush with shingles on inside. Shingles overhang plywood on outside. Parts (Steps 31 - 34) Correctly orientate 3G - Side Roof Panel, with shingles overhanging 3G - Left/Right Roof Panels plywood on the side of the shed and flush with plywood toward the center of (51”...
  • Page 22 Position other side roof panel onto rafters as per Steps 31 - 33. Screw Bottom Row of Shingles ONLY for now. Screw on angle Roof Seams. away from shingle edge to prevent it from cracking. Hardware With Roof Panels aligned, screw panels down to center rafters with S1 - 2 1/2”...
  • Page 23 Attach above the exposure line. Exposure Line. Hardware Screw first filler shingle down to rafters using 1 - 2 1/2” Screw per panel (2 in S1 - 2 1/2” Screws total). Screw on slight angle and make sure to screw into rafter. Screw slightly above x 4 total 3rd row of shingles (exposure line).
  • Page 24 90° Metal Brackets. Hardware Secure roof panels to walls at both ends by positioning S2 - 1 1/4” Screws x 16 total 2 - 90° Metal Brackets on plywood and outside rafters and securing Y2 - 90° Metal Brackets x 4 total with 4 - 1 1/4”...
  • Page 25: Trim & Miscellaneous Section Steps

    4. Trim & Miscellaneous Section Exploded view of all parts necessary to complete the Skirting, Trim, Facia and Miscellaneous Pieces. Identify all parts prior to starting. Front Facia Roof Ridge Boards Facia Detail Rear Facia Rear Facia - L/R (Part 4S) (Part 4U) Plates (Part 4T) (Part 4S)
  • Page 26 Gaps on outside will be covered by Corner Trim later. Complete side and rear skirting attachments. Skirting meets flush. Parts Hardware Attach 4B - Front Bottom Skirting with 4B - Front Bottom Skirting N1 - 1 1/2” Finishing Nails 4 - 1 1/2” Finishing Nails per piece as per (1/2”...
  • Page 27: - Aluminum Door Tracks

    Gap will be covered. Parts Hardware Position and attach 4D - Rear Corner 4D - Rear Corner Filler Trim N1 - 1 1/2” Finishing Nails Filler Trim with 5 - 1 1/2” Finishing Nails per (3/4” x 2 1/2” x 42”) x 4 x 20 total piece as per Step 45.
  • Page 28 Twist Roller Cart onto bolt. After doors are hung, you may need to adjust this until doors hang straight up and down at equal height. Parts Locate all four Y35 - Roller Assemblies. Before attaching to top of 4F - Sliding Doors doors, assemble the units as shown above.
  • Page 29 1/4” Gap Lower Door Track 1 5/8” Parts Locate 4H - Door Tracks and 4J - Door Stops. Middle Door Stop 4H - Lower Door Track should be centered on shed and outer Door Stops should be 1 1/2” from (1 1/2”...
  • Page 30 Door Stop and Track Cover are flush Parts Hardware Locate 4I - Door Track Covers. Lineup so Track 4I - Lower Door Track Cover S1 - 2 1/2” Screws Covers are flush with Door Stops. This creates an (3/4” x 3 1/2” x 44 1/4”) x 3 x 12 total enclosure so doors can not slide out of the track.
  • Page 31 Left Side Right Side Door Door Door Flange attaches to Left Side Door. Flush with inside of door frame. Parts Position 4G - Interior Door Flange on the rear of the left side 4G - Interior Door Flange door (when viewed from the front of the shed). Ensure flange is flush (3/4”...
  • Page 32 tight underneath soffit. Parts Place 4M & 4N - Front Corner Trims in front corner and align as 4M - Front Corner Trims illustrated above. Do a dry run prior to attaching to achieve best fit. Start (1/2” x 5 1/2” x 78 1/2”) x 2 with 5 1/2”...
  • Page 33 Parts Hardware Attach 4P - Rear Middle Trims where wall 4P - Rear Middle Trim N1 - 1 1/2” Finishing Nails panels come together at rear seam. Attach with (1/2” x 2 1/2” x 88 3/4”) x 2 x 16 total 8 - 1 1/2”...
  • Page 34 Attach other Front and Side Facia to opposite corner as per Step 55. Small gaps may occur. Attach 4S - Front Facia - Center to rafter ends as shown above. Small gaps may occur between the Center and Left/Right Facia, but these will be covered by Facia Detail Plates in Step 59. Attach with 2 - 1 1/2”...
  • Page 35 Parts Hardware Attach 4T - Facia Detail Plates to cover 4T - Facia Detail Plates N1 - 1 1/2” Finishing Nails seams where Front and Rear Facia pieces meet. (5 1/2” high) x 4 x 16 total Secure with 4 - 1 1/2” Finishing Nails per piece. Parts Hardware Position 4U - Roof Ridge Board at the...
  • Page 36 caulk in siding gap at top. caulk in siding Requires a large channel on both amount. sides of window. Parts Locate 4V - Window Inserts. Before installing, dab caulk in siding channel 4V - Window Inserts on both sides of window opening. This will prevent water from getting in behind (18 1/4”...
  • Page 37 Congratulations on assembling your 12x4 SpaceSaver Shed with Sliding Doors! Note: Our Sheds are shipped as unfinished products. If exposed to the elements, the western red cedar lumber will weather to a silvery-gray color. If you prefer to keep the cedar lumber looking closer to the original color, we suggest that you treat the wood with a good oil base wood stain.

Table of Contents