Download Print this page

OLT SSGS1216-FJ-Ply Assembly Manual page 15

12x16 sunshed garden shed with plywood roof

Advertisement

17.
Attach a Double Window Wall Panel in corner. Attach as per Step 14. Start positioning and
securing remaining Double Window Walls. Attach wall studs together as per Step 14.
Wall panel will sit
flush with floor
framing at front of
shed.
18.
Complete attachment of left side Solid Wall Panels. At the front of the shed, side walls will sit
flush with front floor framing.
19.
Secure remaining two Window Walls to both front corners of shed.
Toll Free 1-888-658-1658
Important: Pilot
hole studs first.
www.outdoorlivingtoday.com
Page 15
sales@outdoorlivingtoday.com

Advertisement

loading

This manual is also suitable for:

Fj bevel