Download Print this page

OLT SSGS1216-FJ-Ply Assembly Manual page 10

12x16 sunshed garden shed with plywood roof

Advertisement

5.
Attach Floor Runners to Floor Frames with 13 - 2 1/2" screws per completed runner length (39
Total). For Wide Floor Runner use 4 screws in the 56" pieces and 5 screws in the 70" piece. For the
3 1/2" Floor Runner use 5 screws for the 72" pieces and 3 screws for the 38" pieces.
Concrete Slab
Foundation
6.
With some helpers, flip the floor section over so it rests on your foundation. Wide Floor Runner
should rest in the center of your foundation.Caution: you will need 2 people to assist you. Be careful
when laying floor down not to bend or twist floor. When in place, level floor completely.
7.
Lay out Remaining Floor Runners on second floor frames ( 4x 72" Runners and 2x 38" Runners).
Attach remaining runners with a total of 26 - 2 1/2" screws as per Step 5.
Toll Free 1-888-658-1658
Foundations
Note: The floor will be flipped over and floor
runners will sit on your foundation.
important to note that having a level foundation
is critical. Choosing a foundation will vary
between regions. Typical foundations can be
concrete pads or patio stones positioned
underneath the floor runners.
Wide Floor
Runner
www.outdoorlivingtoday.com
Page 10
It is
sales@outdoorlivingtoday.com

Advertisement

loading

This manual is also suitable for:

Fj bevel