ATL P1000 Series Library Unpacking Instructions
Document 6221100-02, Ver. 2, Rel. 0
March 1999
8

Unpacking the Library

The P1000 unpacking procedure consists of the following steps:
receiving the library from the shipper (see "Unloading Space
Requirements" on page 9)
uncrating the library (see "Uncrating the Library" on page 10)
installing the slide assembly in the rack (rack-mount library only)
(see "Installing the Slide Assembly in the Rack" on page 13)
removing the library from the pallet (see "Removing the Library
from the Pallet" on page 22)
removing the internal packing materials from the library (see
"Removing the Internal Packing Materials" on page 28)
The following sections detail each of these steps.
Note: Before performing the procedures in the following sections, make sure
the site you have chosen for the installation meets the requirements
listed in "Selecting an Installation Location" on page 5.
Unpacking the Library
5