6-8. SOLENOID VALVES
(Continued)
6-9. OIL CHANNEL
CLEAN-OUT
Nov. 2009
4. Remove elbow and fittings from solenoid stem assembly
and attach them to the new solenoid, using pipe sealent on
the threads.
5. Reattach the conduit to the new solenoid, threading the
wires through the conduit.
6. Reattach the solenoid assembly to the fryer.
7. Reattach the conduit to the fryer and connect the wires to
the fryer using wire nuts.
8. Replace rear side panels or rear panels and reconnect power
to the fryer.
Should the drain channel, under the vats, become clogged, access
to a clean-out plug is available on both right and left sides of the
unit.
6-11
Model EEG-142, 143, 144