6-8. SOLENOID VALVES
(Continued)
6-9. OIL CHANNEL
CLEAN-OUT
May 2012
4. Remove elbow and fittings from solenoid stem assembly
and attach them to the new solenoid, using pipe sealent on the
threads.
5. Reattach the conduit to the new solenoid, threading the wires
through the conduit.
6. Reattach the solenoid assembly to the fryer.
7. Reattach the conduit to the fryer and connect the wires to the
fryer using wire nuts.
8. Replace rear side panels or rear panels and reconnect power to
the fryer.
Should the drain channel, under the vats, become clogged, access to
a clean-out plug is available on both right and left sides of the unit.
6-11
Model EEG-153, 154