Putting The Unit Into Service; Filling Out The Commissioning Report - Henny Penny FlexFuison GOLD FGE-615 Installation Manual

Electric combi
Table of Contents

Advertisement

Information from the nameplate entered?
SN: _____________________________ Typ: _____________________________
QN (Hi): _____________________________
E: ________________________________________________________________
Bez: ______________________________________________________________
Item-Nr.: _____________________________ (if listed)
Obvious damage to the unit?
What and where?:
______________________________________________________________________________
Unit levelled?
Elements that can tilt levelled? (for instance: pans)
Power connection made properly?
Equipotential bonding
Floating contact
Electrical connections made properly?
Residual-current protective device connected immediately before this unit?
Residual-current protective device connected before this and other units?
7

Putting the unit into service

7.1

Filling out the commissioning report

General
Electrical connection
Filling out the commissioning report
Power optimizing system
...
Putting the unit into service
Yes
Yes
7
No
No
39