Putting the unit into service
8
Filling out the commissioning report
Prerequisite
Information from the nameplate entered?
SN: _____________________________ Typ: _____________________________
QN (Hi): _____________________________
E: ________________________________________________________________
Bez: ______________________________________________________________
Item-Nr.: _____________________________ (if listed)
Obvious damage to the unit?
What and where?:
______________________________________________________________________________
Unit levelled?
Elements that can tilt levelled? (for instance: pans)
Power connection made properly?
Equipotential bonding
Floating contact
38
8
Putting the unit into service
➢ Electrical connection made
➢ Water connection established
➢ Sewage connection established
➢ Exhaust connection made (if required by the customer)
➢ Rear panel enclosed
➢ Connection cover closed
a) Instruct the operator.
b) Fill out the commissioning report.
8.1
Filling out the commissioning report
General
Electrical connection
Power optimizing system
...
Yes
No
Yes
No