Putting the unit into service
8 Putting the unit into service
INFORMATION
Prerequisite Electrical connection made

8.1 Filling out the Start-up operation report

Information from the nameplate entered?
SN:
E:
Bez:
Item-Nr.:
Obvious damage to the unit?
What and where?:
Unit levelled?
Unit fastened to floor?
secured against tipping
Screwed to floor
Glued to floor
Electrical connection made properly?
Potential equalization
Potential-free contact
Electrical connections made properly?
Fault current device connected directly before this unit?
Fault current device connected before this and other units?
42
If the unit is not put into service immediately after being connected and the
function check, all inspections must be repeated.
Water connection made
Wastewater connection made
Exhaust air connection made ​ ​ ( if required by the customer)
Function checked successfully
Housing closed
1. Instruct operator.
2. Fill out the Start-up operation report.
General information
Typ:
(if listed)
General information
secured against shifting
Screwed to floor
Glued to floor
Electrical connection
Power optimization system
Installation instructions
Yes
No
Yes
No
Yes
No