Sensor Delta Dimming Installation Guide

Installation checklist

Please go over this checklist to confirm that you have correctly installed the
Sensor Delta Installation Rack.
Is the rack securely mounted with all mounting bolts tight?
Is there sufficient clearance on the left side (6 inches {15cm} minimum)
and in front (17 inches {41cm} minimum) to allow the rack door to open
completely?
Note: Sensor installed side by side do not need the 6 inch (15cm) clearance
on the left side.
Is there sufficient clearance (10 inches {25cm} minimum) above the rack?
Are all distribution cables landed and properly terminated? (Any circuits
not landed must be clear or capped off.)
Do all control cables meet spec? (See ETC installation drawings or Table
6 : Network cable requirements on page 36.)
Are DMX512 and ETCLink data cables routed as specified in the
drawings?
Are all air leaks into the dimmer and auxiliary bays sealed?
Contacting ETC Technical Service
If you have any questions about the installation of your
Sensor Delta Installation Rack, please contact:
United States
ETC Technical Service
3030 Laura Lane
Middleton, WI. 53562
Phone: 800/755-4382
Fax: 608/836-1736
Europe
ETC Europe LTD.
5 Victoria Estate, Victoria Road
London, W3 6UU, England
Tel: (+44) 20 8896 1000
Fax: (+44) 20 8896 2000
Note: When contacting ETC, always tell the representative you have a
Sensor Delta Dimming system.
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sr24dSr48d

Table of Contents