Basic Commissioning; Switch Operating Language - WEIHONG NK280B Manual

Integrated cnc system
Hide thumbs Also See for NK280B:
Table of Contents

Advertisement

• Linkage configuration: Z1-axis and Z2-axis can be active at the same time.
• Alternative configuration: Only Z1-axis or Z2-axis can be active at one time.
See
Select Z-axis
for details.
General Three-Axis Software
Use the software for normal machine tools with X-axis, Y-axis and Z-axis.
Functions such as "Axis Selection" and "Set Tool No." are absent here.

Basic Commissioning

Before machining, you need to conduct commissioning to the tool machine and set motion
control system.
After the system is correctly connected and powered on, you can start commissioning according
to the following steps:
Table 1: Overview of Basic Commissioning Process Before Machining
Step
Operation
1
According to driver's brand used, set station
address and adjust servo gain for the driver.
2
Check port information, detect status and wiring of
machine tool and adjust port polarity.
3
Adjust axis direction.
4
Return to machine origin.
5
Move machine tool and set related parameters.
6
Set workpiece coordinate system (WCS), including
workpiece offset and public offset.
Commissioning finishes. Wait for machining.

Switch Operating Language

At present, Simplified Chinese and English are available.
To switch operating language in use:
1. Press System > C to open System Info interface.
2. Press F3 to choose target language.
3. Restart the software.
The target language takes effect.
Basic Commissioning
Reference
Execute Auto Adjustment
Check and Modify Port
Adjust Axis Direction
Return to Machine Origin
Modify Parameters
NK280B Parameter
Reference
Set Workpiece Coordinate
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents