2: MIS NAS System Hardware Installation

Check all Cable Connections and Airflow

Check the Airflow

Supply Power to the System

32
Make sure all power and data cables are properly connected and not blocking the system airflow.
The system component layout was carefully designed to direct sufficient cooling airflow to the
components that generate the most heat.
Note: Make sure that all power and data cables have been routed in such a way that they do not
block the airflow generated by the enclosure fans.
Connect the power cords from all the power supply modules (located at the rear of each enclosure)
into a power strip or power distribution unit (PDU). An optionally available uninterruptible power
supply (UPS) can ensure power availability if primary power fails.
007-5921-001

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NAS MIS and is the answer not in the manual?

Questions and answers

Table of Contents