Setting-Out Line Line - Sokkia 130R Series Operator's Manual

Reflectorless total station
Table of Contents

Advertisement

3. Press [OK] on the screen of step
2. The coordinate value of the
required point is calculated and
displayed.
• [REC]: records the coordinate
value as a known point data.
Recording method:
"22.1 Registering/Deleting
Known Point Data"
• Press [ S-O] to move to setting-
out measurement of the required
point.
"14. SETTING-OUT
MEASUREMENT"
4. Press {ESCAPE}. Continue the
measurement (repeat steps from
4).
15.3

Setting-out Line Line

Setting-out line line measurement tells how far horizontally the measured point is
from the baseline and how far vertically the measured point is from the connected
line. The baseline can be offset in a horizontal direction if necessary.
• Before performing setting-out line line, the baseline must be defined.
Profile View
1st Pt.
S e t - o u t l i n e
N
E
Z
Measured Point
Baseline
Length
Offset (horizontal direction)
Measured Point
Cut
15. SETTING-OUT LINE
1 1 1 . 7 9 6
9 4 . 6 7 5
1 2 . 0 2 4
R E C
Offline (--)
2nd Pt.
S - O
69

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Set1130r/r3Set2130r/r3Set3130r/r3Set4130r/r3

Table of Contents