16. POINT PROJECTION
• Offset: Distance from point to
project to the position at which a
line extending from point of
project intersects the baseline at
right angles. (Y direction).
• d.Elev: Elevation between the
baseline and the projected point.
• Press [XYZ] to switch the screen
display to coordinate values.
• Press [OFFSET] to switch the
screen display to distance
values.
• Press [REC]: records the
coordinate value as a known
point data.
Recording method:
"22.1 Registering/Deleting
Known Point Data"
• Press [ S-O] to move to setting-
out measurement of the
projected point.
"14. SETTING-OUT
MEASUREMENT"
5. Press {ESCAPE}. Continue the
measurement (repeat steps from
3).