What To Do Next For Member Switches - Allied Telesis x330 Series Installation Manual

Fanless gigabit layer 3 access switch virtual chassis stacking
Hide thumbs Also See for x330 Series:
Table of Contents

Advertisement

What to Do Next
for Member
Switches
After configuring a member switch, do the following:
1. Power off the member switch by disconnecting its AC power cord from
the AC power source. Refer to Figure 69 on page 130.
2. Repeat these procedures to configure all member switches, assigning
each one a unique ID number and designating the Multi-Gigabit copper
ports as the stack trunk.
3. If you have not already configured the master switch, perform
"Configuring the Master Switch" on page 123.
4. Power off the master and all member switches.
5. Cable the Multi-Gigabit copper ports on the master and member
switches. For trunk cabling examples, refer to "Multi-Gigabit Copper
Ports" on page 47. Refer to "Cabling Copper Ports" on page 140.
6. Perform "Powering On the Stack" on page 138.
7. Perform "Verifying the Stack and Assigning Priority Numbers" on
page 113 to confirm that the switches formed the stack.
8. Cable the networking ports, as explained in Chapter 10, "Cabling
Copper and SFP+ Ports" on page 139.
x330 Series Installation Guide for Virtual Chassis Stacking
137

Advertisement

Table of Contents
loading

This manual is also suitable for:

X330-10gtxX330-20gtxX330-28gtx

Table of Contents