Configuring The Master Switch - Part I - Allied Telesis x330 Series Installation Manual

Fanless gigabit layer 3 access switch virtual chassis stacking
Hide thumbs Also See for x330 Series:
Table of Contents

Advertisement

Chapter 9: Building Stacks with Multi-Gigabit Copper Ports
Configuring the
Master Switch -
Part I
Table 12. Configuring the Master Switch for a Stack Trunk of Multi-Gigabit Copper Ports - Part I
Step
1
Power on the master switch and wait one minute for it to start the AlliedWare Plus
management software. Refer to "Powering On the Switch" on page 100.
2
Start a local management session. Refer to "Starting a Local Management Session"
on page 102.
3
Enter the ENABLE and CONFIGURE TERMINAL commands to move to the Global
Configuration mode.
awplus> enable
awplus# configure terminal
Enter configuration commands, one per line. End with CNTL/Z.
124
Here are the main steps to Part II:
1. Add the member switches as provisioned units to the configuration of
the master switch, with the SWITCH PROVISION command.
2. Remove the default SFP+ S1 and S2 ports from the stack trunk on the
provisioned member switches with the NO STACKPORT command.
3. Designate the Multi-Gigabit copper ports as the stack trunk on the
provisioned member switches, with the STACKPORT command.
4. Save your changes with the WRITE command in the Privilege Exec
mode.
5. Reboot the master switch with the REBOOT command.
6. Start a new local management session.
7. Verify your changes with the SHOW STACK and SHOW RUNNING-
CONFIG INTERFACE commands.
To configure the master switch for a stack trunk of Multi-Gigabit copper
ports, start by performing the procedure in Table 12.
Description and Command

Advertisement

Table of Contents
loading

This manual is also suitable for:

X330-10gtxX330-20gtxX330-28gtx

Table of Contents