Storage; Assembly And Installation Of The Loadstar-S - Eaton LoadStar-S JSB Mounting And Operating Instruction

Table of Contents

Advertisement

CAUTION!!
Always dispose of packaging materials in an environmentally
friendly manner and in accordance with the applicable local
disposal regulations. If necessary, commission a recycling
company.
Observe the handling instructions on the packaging!

5.3 Storage

Packages must be closed until assembly and stored in
accordance with the installation and storage markings on
the outside.
Packages should only be stored under the following con-
ditions:
• Do not store outdoors
• Dry and dust-free storage
• The storage location should be clean and tidy.
• The storage time should be as short as possible in the
interest of the user (FIFO method).
• The stacking of pallets or equipment is not permitted.
Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de

6 Assembly and installation of the LoadStar-S

6 Assembly and installation
of the LoadStar-S
WARNING! DANGER OF INJURY!
Improper installation and installation can lead to serious per-
sonal injury and/or damage to property. This work may there-
fore only be carried out by authorised, instructed personnel
familiar with the operation of the device and in compliance
with all safety regulations.
• Ensure sufficient freedom of movement.
• Pay attention to cleanliness and order at the workplace. Loo-
se or loose components and tools are sources of accidents!
• Ensure sufficient cooling of the system
• Observe ambient conditions in accordance with protection
type and class (with regard to protection against contact
with live parts and ingress of dust, foreign bodies or moi-
sture).
• The cable length in a lighting circuit up to the last luminaire
in the circuit must not exceed the permissible cable length.
WARNING!
Work on the general supply network and the laying of load,
signal and control lines as well as the connection of the
battery power supply may only be carried out by qualified
electricians with special knowledge of the legal and technical
principles for the installation and operation of emergency
lighting systems. This also applies to the initial commissioning
or re-commissioning of the emergency lighting system or
the LoadStar-S system.
Take all necessary measures for occupational safety!
In addition to compliance with general technical standards
and procedures, this includes, in particular, compliance with
all special notes and instructions.
All connecting cables may only be laid in accordance with
the relevant electrical engineering directives and standards
(e.g. DIN VDE 100 series of standards).
In addition, observe all national directives and regulations of
the country in which the system is installed and operated.
Secure all cable inlets and outlets of the LoadStar-S cabinet
against mechanical damage to the cables or moisture ingress
using the M cable glands or rubber seals provided for this
purpose.
ATTENTION!
Short-circuits and incorrect polarity can damage the battery
bank or the installations of a LoadStar-S system.
When interfering with the electrical system (e.g. connecting
control or signal lines) or electronics (e.g. plugging or unplug-
ging modules in the control cabinet), the ESD protection must
be observed! Never switch the mains or battery power supply
on or off under load. In both cases, the system must have
been blocked beforehand via the control unit.
NOTE!
13

Advertisement

Table of Contents
loading

Table of Contents