  • Page 1 Eaton LoadStar-S JSB Mounting- and Operating Instruction Eaton LoadStar-S JSB Targed Group: Qualified electricains acc. EN 50110-1 and Electrical instucted persons...
  • Page 2: Table Of Contents

    5.1 Transport inspection ........... 12 24 CM.1 1,7 A Charging modules ........ 63 5.2 Packing ..............12 25 CM 3,4 A Charging modules ........63 5.3 Storage ..............13 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 3 Appendix C: Position plans of the luminaires ..... 97 Appendix D: Installation examples Monitoring Modules ....98 Appendix E: Test and inspection protocol for emergency lighting systems ........99 General Safety instructions ........100 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 4: Important Notes

    INTERSEROH GmbH. The contract number is 85405. This of these components. guarantees that all registered packaging material is reused and all the requirements of the Packaging Ordinance are fulfilled Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 5: Safety

    • the activities are carried out under the supervision and LoadStar-S devices meet the requirements of EN62034, control of competent personnel. “Automated testing systems for battery-operated safety lighting, ” and are classified as type PERC. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 6: Occupational Safety

    IMDG: The International Maritime Dangerous Goods Code ATTENTION! PHYSICAL DAMAGE! IATA: The International Air Transportation Association (world- wide) The battery can be damaged or destroyed by improper transportation. ICAO: Civil Aviation Organization’s Technical Instructions for Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 7: Transport Inspection

    Fig. 2: Marathon – Residual Capacity in % of C10 versus The stacking of pallets or devices is not permitted. Avoid storing unpackaged blocks on surfaces with sharp edges. It is recommended that the same type of storage conditions Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 8: Set Up And Installation

    20 °C. • Higher temperatures reduce the design Above 40 °C there is a risk of the „thermal runaway effect“ . Lower temperatures reduce available capacity and extend recharge time. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 9: Room Dimensions And Floor Condition

    A - 28 x 6.72 m3/h A - 188,21 cm2 The required ventilation openings in the F90 walls are to be secured in terms of building protection, e.g. by: F90 fire dampers. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 10: Preparations For Battery Installation

    100 Ah line capacity and at the smallest possible distance. • M6 threaded hole: 11 ± 1 Nm • Each string has a fuse. • M8 threaded bolt: 8 ± 1 Nm Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 11: Mounting Positions For Agm Blocks

    Always wear when working on and with the battery: • Safety shoes for protection against heavy falling parts and slipping on non-slip surfaces. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 12: Disruptions

    5.2 Packing If no return agreement has been made for the packaging, separate materials by type and size and return them for further use or recycling. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 13: Storage

    Never switch the mains or battery power supply on or off under load. In both cases, the system must have been blocked beforehand via the control unit. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 14 Install, install and connect the lighting equipment in accor- dance with the relevant electrical engineering directives and standards. In addition, observe all directives and regulations of the country in which the system is installed and operated. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 15 Ensure that the cables have a conductor cross-section that is suitable for the expected current flows to the connected loads. Only one temperature sensor (F+ / F-) and up to four battery Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 16 Connect the cables for the battery power supply of the LoadStar-S switch cabinet: Make sure that the system and the supply lines are discon- nected! Connect the positive conductor to the positive terminal of the switch-disconnector. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 17 When retrofitting fuse elements, the enclosed sticker must one side via a shield quick connector. be applied with the correct polarity to identify the connections as shown in the illustration. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 18 For easy assembly/disassembly, these modules are connec- ted via pluggable screw terminal blocks that can be plugged or unplugged at the front of the modules. The connecting cab- Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 19: Installation Example Loadstar-S

    7 Installation example LoadStar-S 7 Installation example LoadStar-S ATTENTION! 1kΩ loop resistance install Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 20: Block Diagram Loadstar-S

    CM.1 1,7A L/N 250 V Relay Module RS485 SKU.1 CG-S 4x1,5 A Rack Change-over Modules CM 3,4 A Rack Charger Modules CCB-Bus BDM. BBS. Battery Data Module Battery Block sensors Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 21: Commissioning And Further Work

    NOTE! By bridging L / N or U1 / 01 ( ... ), active components of the electronics and the luminaires (-EVGs) are protected against possible destruction! Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 22: Check The Fuses Of The Mains Or Battery Power Supply

    The setting of the trickle charge vol- tage is done via the Touch Screen and is described in chapter Charger Settings Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 23: Switching On The System

    Back Up USB Stick with fac- tory specific device configuration with the order number 40071362694 (LoadStar-S HMI Configuration / USB) to avoid a new configuration of the device in case of failure. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 24 EATON white paper „Cybersecurity considerations for electrical distribution systems“ , which can be downloaded as a PDF file with a search engine under the search term „WP152002EN“ . Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 25 Settings for publishing the charger information on the main device The substation is now connected to the main station Settings for subscribing to the charging unit in the subs- tation Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 26 ACU bus is provided by the Group Device Status menu. The information „ Total pub“ shows the sum of all published information (both time-critical and non-time- critical). Number of published information Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 27 Main distributor device 1: ACU Bus ID 1 Sub-distribution board device 2: ACU Bus ID 2 3-PM-IO Module 20 published. 3-PM-IO Module 20 subscribed. © 2017 Eaton. All Rights Reserved.. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 28 In all other user groups, the user is locked for 3 minutes after three incorrect entries. If no entry is made within 10 minutes the user is logged out automatically. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 29 Load and save device configuration via - Copy Config to USB - Copy Config from USB - Eject USB - Select Firmware - Copy Lum types from USB • Start FT Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 30 Basic settings o Charger/Battery Setting o Test Settings o General settings - System Settings o Log book • Circuit Setup • Luminaire setup • I/O Modul Setup Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 31 Charging/Battery Setting o Test Settings o General settings - System Settings - Timer Settings - HMI Settings • Log book • Circuit Setup • Luminaire setup • I/O Modul Setup Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 32 - Relais Module Settings - HMI Settings - User Settings o Log book o ACU settings o PSU Settings o GLT Settings • Circuit Setup • Luminaire setup • I/O Modul Setup Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 33: Data Download Table Via Pc Software And Usb Stick

    Entries of the nominal capacity, num- Battery setup ber of battery blocks, cells per block and the float charge voltage Icon Battery information such as type, order General setup number, etc. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 34 Actuate date Use the arrow keys to enter the start start time time, time and distance between two Duration test tests. time start time Duration test Distance between tests Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 35 The setting range is from 0-65535. Emergency light run-on time -Manual override -selective emergency light -function test according to S1S2 on -Name: -Information: Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 36 The setting range is from 0-65535. Emergency light run-on time -Manual override -selective emergency light -function test according to S1S2 on -Name: -Information: Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 37 Ready light = All lights are switched To configure the off and switch on automatically at circuit type of the power failure. circuit. Permanent light= All lights are on continuously. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 38 Per Leuchtensetup was previously selected as the circuit type for the circuit. Icon Luminaire Actuate Icon General Name, Informati- on, W and VA. Free text can be entered. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 39 Luminaire switches on via LON lamp in the „Pro- switch. gramming by lamp Icons Timer= luminaire switches on setup“ mode. via programmed TimerFunction. Icon IO/3PM-IO = Luminaire switches on via separate I/O modules. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 40 32 devices. Icon Input Name Assign the input name Icon Actuate to There can be up to the inputs a text. 8 inputs available. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 41 - AE disruption - BT-Start - power outage UV - BT/FT cancel - Block device - Switch off continuous light - Switching on the ready light - fan monitoring Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 42 Icon Menu Actuate Icon Basic settings Actuate Icon PSU Settings Actuate Icon PSU 1-5 Select the PSU icon to be configured. Settings Icon Serialnr: Visualize PSU serial number Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 43: Charge Voltage Setting Table (Login=Expert)

    Enter the number of battery blocks per battery Enter the float charge voltage per cell Trickle charging in mV. Number of cells Enter the number of cells per battery per block block. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 44: Remote Access Table Via Web Browser

    Information for the service Activate Service information about Enter the IP address on the the TFT touch display and browser page and save as the integrated web server. favourite. https://xx.xx.xx.xx/ webvisu.htm XX.XX.XX.XX Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 45 Icon switch 1 - 16 Up to 16 LON switches can be assigned to the LoadStar-S. A maximum of two switches can be assigned to each circuit or luminaire. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 46 „Create User“ Actuate. If you want to create another user group, click on the icon Actuate and repeat the process. Finally, click the OK but- ton. Confirm button. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 47 The mail server settings must Gmail/SecureSockets be carried out by the IT depart- User name ment. Sender Port Send IP Test Reset Password encryption View Log Prefix Authentication Charset ISO 8859-1 Home Back" Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 48 Password: At least 6 characters Charging-/batteriesta- Values: Charge voltage/discharge voltage Charging/discharging current capacity Ambient temperature Duration testTime Info: Software version hardware status Status: battery string Battery block (optional) charging module Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 49: Connecting The Loadstar-S To The Visionguard Visua- Lization Software

    LoadStar-S must be connected to the Ethernet via the RJ 45 socket on the ACU module. All other settings can be found in the 16.14 Connecting the LoadStar-S to the VisionGuard visualization software. Ethernet connection Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 50: General Product Description Loadstar-S

    Furthermore, an important function of the safety lighting system is to ensure the ope- rational readiness of all connected Safety and escape sign luminaires with automatic monitoring. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 51: Overview Of Assemblies

    • Name of the installation (40 characters) timer function, automatic function and operating time test, selection of menu language, password protection Using optional Eaton software, programming can be carried out offline on the PC. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 52 Directly on the color touch screen. Order details type Description Order No. HMI Module 4,3" 4.3" colour touch for door installation 40071361644 HMI Module 7" 7" colour touch for door installation 40071361654 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 53 19 HMI Color Touch Screen 4,3“ and 7“ Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 54: Acu Module

    Termination RS 485 BUS Note: Per bus both DIL switches are set to ON = Termi- nating resistor 120 Ohm active. Relais 2 Relais 4 RS 485 BUS Ext. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 55 Switch all luminaires to non-main- tained light Switch a defined group of lumi- naires for maintained lighting Scenario active Malfunction of the technical ventila- tion of the battery room Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 56 Faults (red LED): The device function is disturbed. Scenario active (orange LED): An evacuation was triggered via the AE-CU controller. Service Pin: To login and logout the ACU module. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 57 ≤ 0,12A short-circuit proof ACU Modul Bus Topologie: Line Cable type: E.g. IY(ST)Y 4x2x0,8mm Maximum cable length: 900m Terminating resistor: Switchable via DIL switch on ACU. Maximum number of LoadStar-S systems. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 58: Psu Module

    The PSU module is powered by the 216V battery and the 250V AC module. Ordering details type Description Order No. PSU Module Power supply module for rack mounting 40071361590 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 59: Ac Module

    (Mains): 250AC Input voltage AC ACU CAN / LON Bus IN Module 220 ... 240V AC Frequency: 50 or 60Hz ACU CAN / LON Bus OUT Potential-free contact PSU OK Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 60: Bcm.1 Module

    SELV. This means that the cabling to the connected systems must at least be single insulated, in addition the power supply (24V/0.5A) must at least be single insulated from mains or battery. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 61 Shunt connectors, I3+ external temperature sen- sor must be connected to terminals T + and T-. Shunt connectors, I2 + Shunt connectors, I1/2- Shunt connectors, I1+ Terminals CCB +/-, Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 62 LED ISO Failure: The ISO fault LED lights up red if there is an insulation fault in the battery circuit. Strang 1 Strang 2 Strang 3 Strang 4 BCM.1 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 63: Cm.1 1,7 A Charging Modules

    The LEDs indicate the operating status of the charging module. Ready for operation (LED lights up). Ordering details type Description Order No. CM 3,4A Charge module 3.4A for rack mounting 40071360370 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 64: Circuit Change Over Module Sku.1 Cg-S 4X1,5A

    Typical switching over time: AC to DC = 450 ms Ordering details type Description Order No. SKU.1 CG-S 4 x 1,5A Circuit switching 4 x 1.5A for Snap subrack Moun- 40071361550 ting Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 65: Circuit Change Over Module Sku.1 Cg-S 2X3A

    Typical switching over time: AC to DC = 450 ms Ordering details type Description Order No. SKU.1 CG-S 2 x 3A Circuit switching 2 x 3A for Snap subrack Mounting 40071361560 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 66: Circuit Change Over Module Sku.1 Cg-S 1X6A

    Typical switching over time: AC auf DC = 450 ms Ordering details type Description Order No. SKU.1 CG-S 1 x 6A Circuit switching 1 x 6A for Snap subrack Mounting 40071361570 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 67: Circuit Change Over Module Sou Cg-S 2X4 A

    10 TE (10 and 17 ,8 mm) Ordering details type Description Order No. SOU CG-S 2 x 4A Circuit switching over module 2 x 4A for DIN rail 40071360430 mounting. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 68: Cg Iv.1 Relay Module

    Battery duration test ON => 24V DC ≥ 20ms Battery duration test OFF => 24V DC ≥ 20ms Ordering details type Description Order No. CG IV.1 Relay module for subrack Mounting 40071361620 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 69: Rcm-A Remote Indication

    Order No. RCM-AS remote indication Subassembly for wall mounting 40071362390 RCM-AR remote indication Component for installation in switch or cavity wall 40071362395 flush-mounted sockets according to DIN VDE 0606 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 70: 32 3-Pm Module

    Phase monitor module for DIN rail mounting 40071361660 possible use of terminal 3as support point clamp LoadStar-S IN1.1 -1.2 to IN 6.1 - 6.2 24V loop for emergency light request Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 71: 33 3-Pm-Io Module

    120Ω (bridge between terminals B1 and B2) Terminals Connection cross-sections: 0.2-2.5 mm² rigid/flexible Ordering details type Description Order No. 3-PM-IO Module Phase monitor / light switch interrogation Bus 40071361670 module for DIN rail mounting Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 72: 34 3-Pm-Io-Inv Module

    Terminals Connection cross-sections: 0.2-2.5 mm² rigid/flexible Ordering details type Description Order No. 3-PM-IO-INV Module Phase monitor / light switch interrogation Bus mo- 40071361680 dule for DIN rails Mounting with inverted inputs Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 73 - it is not permitted to bundle several data cables within one shielded cable! The 120 Ohm terminating resistor is integrated in the modules and can be activated by a bridge at terminals B1/B2. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 74: Loadstar-S 20

    3 x M40 3 x M50 ATTENTION! The dripping water protection of the film is no longer gua- ranteed after the cables have been inserted without the appropriate cable gland. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 75 16 mm² Rigid/flexible Order number accesories: Cupboard base 100mm 40071362282 Cupboard base 200mm 40071362283 Door hinge left 40071362301 Special locking profile half cylinder 40037079790 IP 31 Retrofit kit 40071362291 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 76: Connection Distributor Mains

    Incl. 3 pieces screw caps E18 and 3 pieces D02- 40071347160 for busbar mounting fuse links 25A Busbar cover profile Cover profile in module width for clip mounting to 40071347192 the bottom tray profile Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 77: Connection Distributor Battery

    Incl. 2 pieces screw caps E18 and 3 pieces D02- 40071347161 for busbar mounting fuse links 25A Busbar cover profile Cover profile in module width for clip mounting to 40071347192 the bottom tray profile Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 78: Loadstar-S 20C6

    81 x M20 7 x M40 ATTENTION! The dripping water protection of the film is no longer gua- ranteed after the cables have been inserted without the appropriate cable gland. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 79 16 mm² Rigid/16 mm² flexible Mains distribution board 35 mm² Rigid/35 mm² flexible Order number accesories: Cupboard base 100mm 40071362284 Cupboard base 200mm 40071362285 IP 31 Retrofit kit 40071362297 Door hinge left 40071362306 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 80 Order Number wiring set: 40071346779 15 x Length 1: 300 mm 2 x Length 2: 1000 mm 1 x Length 3: 800 mm 1 x Length 4: 2000 mm 3. Battery console Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 81 300 mm 3 x Length 2: 440 mm 2 x Length 3: 700 mm 1 x Length 4: 300 mm 1 x Length 5: 1200 mm 3. Battery console Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 82 300 mm 3 x Length 2: 440 mm 2 x Length 3: 1000 mm 1 x Length 4: 400 mm 1 x Length 5: 1400 mm 3. Battery console Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 83 300 mm 3 x Length 2: 360 mm 2 x Length 3: 1500 mm 1 x Length 4: 400 mm 1 x Length 5: 1800 mm 3. Battery console Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 84: Loadstar-S 12C4

    49 x M20 4 x M32 ATTENTION! The dripping water protection of the film is no longer gua- ranteed after the cables have been inserted without the appropriate cable gland. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 85 16 mm² Rigid/flexible Order number accesories: Cupboard base 100mm 40071362280 Cupboard base 200mm 40071362281 Door hinge left 40071362300 Special locking profile half cylinder 40037079790 IP 31 Retrofit kit 40071362290 Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 86 Order Number wiring set: 40071346005 15 x Length 1: 240 mm 2 x Length 2: 900 mm 1 x Length 3: 600 mm 1 x Length 4: 1300 mm 3. Battery console Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 87 Order Number wiring set: 40071346779 15 x Length 1: 300 mm 2 x Length 2: 1000 mm 1. Battery console 1 x Length 3: 800 mm 1 x Length 4: 2000 mm Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 88: Loadstar-S Us 7

    ATTENTION! Benennung/ designation 40071362108_nVent The dripping water protection of the film is no longer gua- nVent 12597-632 ranteed after the cables have been inserted without the appropriate cable gland. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 89 2,5mm² Rigid/ 1,5mm² flexible Luminaire circuits 4 mm² Rigid/flexible Battery feed 16 mm² Rigid/flexible Battery through-wiring 16 mm² Rigid/flexible Mains feed 16 mm² Rigid/flexible Mains through-wiring 16 mm² Rigid/flexible Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 90: Loadstar-S Us Sou2

    Max. numbers luminaire circuits: Terminals: Luminaire circuits: 4 mm² Rigid/flexible A3-4 Battery feed: 16 mm² Rigid/flexible Battery through-wiring: 16 mm² Rigid/flexible Mains feed: 16 mm² Rigid/flexible Mains through-wiring 16 mm² Rigid/flexible Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 91: Loadstar-S Us Sou1

    SOU CG-S 2x4A Luminaire circuits: Terminals: Luminaire circuits 4 mm² Rigid/flexible Battery feed 16 mm² Rigid/flexible Battery through-wiring 16 mm² Rigid/flexible Mains feed 16 mm² Rigid/flexible Mains through-wiring 16 mm² Rigid/flexible Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 92: Eaton Ccoe Cybersecurity Recommendations

    Physical security is an impor- tant layer of defense in such cases. LoadStar-S is designed to be deployed and operated in a physically secure location. Following are some best practices that Eaton recommends to physically secure your system: - Secure the facility and equipment rooms or closets with access control mechanisms such as locks, entry card readers, guards, man traps, CCTV, etc.
  • Page 93 LoadStar-S supports network communication with other devices in the environment. This capability can present risks if it’s not configured securely. Following are Eaton recommended best practices to help secure the network. Additional information about various network protection strategies is available in Eaton Cybersecurity Considerations for Electrical Distribution Systems [R1].
  • Page 94 It is a best practice to purge data before disposing of any device containing data. Guidelines for decom- sation missioning are provided in NIST SP 800-88. Eaton recommends that products containing embedded flash memory be securely destroyed to ensure data is unrecoverable.
  • Page 95: Appendix A: Overview Of Pin Assignments

    Terminal = output terminal of final circuit. Terminal designation scheme The assignment of the terminal blocks to the subracks 1 to 5 results from their arrangement from left to right. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 96: Appendix B: Overview Of Pin Assignments

    Appendix B: Overview of pin assignments Appendix B: Overview of pin assignments System type: LoadStar-S Klemmnummer Kabeltype Zielort Klemmnummer Kabeltype Zielort Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 97: Appendix C: Position Plans Of The Luminaires

    Luminaire Switch 1 Switch 1 Switch 2 Switch 2 Circuit name: _____________________________ Switch 1: __________________________________ Switch 2: __________________________________ Monitoring type: ___________________________ Installed power [W]: _______________________ Installed power [VA]: ______________________ Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 98: Installation Examples Monitoring Modules

    DC inverted logic voltage range of 186 V to 275 V. We recommend obtaining a corresponding certificate from the manufacturer. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 99: Appendix E: Test And Inspection Protocol For Emergency Lighting Systems

    Functions / duration test no.: ______________________________ Date: _________________ Time: _________________ Device no. / Location: _________________________ Circuit no.: _____________ Luminaire no./location: _____________ Bug fixed on: ____________________ by: ______________________________ Signature: ________________________ Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 100: General Safety Instructions

    • Akumulatori se moraju upotrebljavati u skladu sa • Atjungiant tokiomis sąlygomis arba susidarius αντικατάσταση. • Die Batteryn sind nicht für den privaten Gebrauch svojom namjenom u ispravnom i neoštećenom trumpajam jungimui atsiranda elektros lankas, geeignet. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 101 • Utilizați numai piese de schimb originale. • Vær oppmerksom på fallende deler ander transport. .‫ال تستخدم إال قطع الغيار األصلية لغرض االستبدال‬ • Akkuja on käytettävä niiden tarkoitettuun käyttö- Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 102 • N’utilisez que des pièces de rechange d’origine kredsløbene ander belastning. αντικατάσταση. en cas de remplacement. • Pas på løsdele ander transport. • Brug kun originale reservedele ved udskiftning. Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 103 • Laitteita on käytettävä niiden tarkoitettuun første gangs bruk. käyttötarkoitukseen asianmukaisessa ja • Ved arAtd med enhetene, skal strømmen først vahingoittumattomassa kunnossa. slås helt av, og det skal sikres at den ikke kan Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de...
  • Page 104 At Eaton, we’re energized by the challenge of powering a world that demands more. With over 100 years experience in electrical power management, we have the expertise to see beyond today. From groundbreaking products to turnkey design and engineering services, critical industries around the globe count on Eaton.