32 3-Pm Module - Eaton LoadStar-S JSB Mounting And Operating Instruction

Table of Contents

Advertisement

32 3-PM Module

32 3-PM Module
In order to avoid the risk of power failures, it is necessary
to permanently monitor the function of the general lighting
light distributors in order to switch on the safety lighting
in the event of a fault. The 3-PM modules are therefore an
important part of the safety system.
If one phase fails, the 3-PM module switches a relay con-
tact and interrupts the 24 V current loop (ACU terminals IN
1 to IN 8) to the emergency lighting units. All emergency
lights in standby mode are switched to continuous light. A
second relay contact (change-over contact 1,2,3) is used to
signal the mains failure. E30 wiring of the 24V current loop
is not required for installation across fire compartments, as
the emergency lighting is automatically switched on in the
event of a first fault in the 24V current loop of a suitably
designed system in the event of an interruption or short
circuit.
Technical description
Dimensions LxHxT:
Weight:
Assembly:
Degree of protection:
Protection class:
Ambient temperature:
Storage temperature:
Relative humidity:
Electromagnetic compatibility:
Degree of pollution:
Overvoltage category:
Rated voltage:
Power consumption:
Relay output:
Switching voltage:
Rated current:
Max. Short-circuit current:
Switching shaft:
Terminals Connection cross-sections:
LED displays L1, L2, L3:
Test button:
Ordering details
type
3-PM Module
70
Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de
85x52x64 mm
0,07 kg
Vertical on DIN rail
IP20
I
-5°C...+55°C
-20°C...+65°C
10...95%, no condensation
Industry EN 61000-6-2, Commercial EN 61000-6-3
2
III for Mains
264V
220...240V AC
2 W
≤ 30 V DC/AC SELV
≤ 0,5A
≤ 5A
≤ 60% UN => OFF
0.2-2.5 mm² Rigid/ flexible
Green = no malfunction
To simulate a mains fault.
Description
Phase monitor module for DIN rail mounting
possible use of terminal
3as support point clamp
The easily accessible test button offers the advantage that
an interruption of the mains voltage is not necessary to
check the function of the voltage monitoring devices. As a
rule, one of the monitored phases must be enabled without
a test button, which at least leads to a failure of the power
supply of the general lighting and thus to severe disturban-
ces of the operational processes.
LoadStar-S
IN1.1 -1.2 to IN 6.1 - 6.2
24V loop for
emergency light request
Order No.
40071361660