Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de
16.3. Configure basic settings table (login = untrained specialist)
Icon Test setup
Icon for automatic
function test
Icons for program-
ming the function
test
Activate test
date
Start time Function
test
time
Start time Function
test
Distance between
tests
Actuate
Date Start time Function test
Time Start time Function test
Distance between tests
Actuate
ACU Bus ID: Enter ID number 1 to 120
Safety power source: Enter 0 to 65535
- ACU Bus ID: 1
With LoadStar-S devices, substations
are connected to the main station by
subscribing to the information of the
charging unit (BCM) from the main
station. For this the substation must
be connected to the main station via
the ACU bus. In addition to the BCM
information, IO/3PM-IO modules and
the inputs of the ACUs can also be
subscribed to. Several main stations
with their substations can also be con-
nected to the same ACU bus, for ex-
ample to use the information of a 3PM
IO in all devices. Each device needs a
unique address, the „ACU Bus ID" .
-Safety power source: 0
For the unique assignment of devices
when connected to the VisionGuard
visualization solution, a number must
be assigned to the safety power sour-
ce. All devices that are connected to
the same safety power source (usually
battery) must use a unique number.
The number „0" has the special me-
aning that the device works in „island
operation" and therefore does not
supply any other devices via its safety
power source. The setting range is
from 0-65535.
Emergency light run-on time
-Manual override
-selective emergency light
-function test according to S1S2 on
-Name:
-Information:
35