Eaton LoadStar-S JSB Mounting And Operating Instruction page 40

Table of Contents

Advertisement

16.6. Table configure IO/3PM-IO Setup (Login = Uninstructed specialist)
16.6. Table configure IO/3PM-IO Setup (Login = Uninstructed specialist)
Ope-
Icon
rating
steps
1
2
3
4
5
40
Mounting- and Operating Instruction Eaton LoadStar-S JSB 40071860396 March 2021 www.ceag.de
Function
Entries
Icon Menu
Actuate
Icon IO/3PM-IO
Actuate
Setup
Icon I/O Modules
The I/O module Icon Actuate which
Up to 25 I/O modu-
should be configured.
les can be present.
If I/O modules are networked, the text
pub or sub is displayed in the respec-
tive icon.
Icon Name
Enter mounting location.
For example, note texts such as
Icon Information
„Closed room. Bring a key"
Icon sub pub
Example: In case of power failure
This function
phase monitor 1, the lights assigned
allows the I/O
to phase monitor 2 should switch on.
modules to be
This networking can be programmed
networked with
within a LoadStar-S device and across
each other.
devices with up to 32 devices.
Icon Input Name
Assign the input name Icon Actuate to
There can be up to
the inputs a text.
8 inputs available.

Advertisement

Table of Contents
loading

Table of Contents