Chapter 2
Installing the Battery
Backup Units
This chapter explains how to install the BBUs that are used on the
MegaRAID 1078-based SAS RAID controllers. Click on a link below to
view instructions for a specific BBU:
Section 2.1, "Installing the LSIiBBU01"
Section 2.2, "Installing the LSIiBBU05"
Section 2.3, "Installing the LSIiBBU06"
Section 2.4, "Installing the LSIiBBU07"
Section 2.5, "Installing the LSIiTBBU03"
Caution:
Electrostatic discharge can damage the BBUs and the
MegaRAID RAID controllers on which they are installed.
Always ground yourself and/or use a ground strap before
touching the RAID controller or the BBU. Perform all
installation work at an ESD-safe workstation that meets the
requirements of EIA-625—"Requirements for Handling
Electrostatic Discharge Sensitive Devices." Follow the
ESD-recommended practices in the latest revision of IPC-
A-610.
If screws are required to attach the iBBU to the MegaRAID RAID
controller, use an ESD-safe Phillips screwdriver to install them. Be sure
the screwdriver is centered in the screw to avoid damaging the screw
head. If you exceed the maximum torque specification, you may damage
the board, connectors, or screws, and you will void the warranty of the
board.
The batteries in the iBBUs must recharge for at least six hours during
fast charge under normal operating conditions. To protect your data, LSI
recommends that you set the RAID controller Write Policy to write-
through until the battery unit is fully charged. When the battery unit is
Intelligent Battery Backup Units for 1078-based MegaRAID® User Guide
Copyright © 2006-2009 by LSI Corporation. All rights reserved.