Operations on first boot/starting a task

Startup flow

uOn first boot
Refer to the "Universal Transmitter SC-U1 Installation Manual" to
1
install the unit and perform wiring.
Make sure that wiring has been properly
2
done and turn on the power switch.
Make sure there is no yellow
cushioning material left at the top and
Caution
bottom and remove it if any.
Otherwise the degree of protection
may be compromised.
Close the cover.
3
Push up the lock lever while
holding the cover, and close the
cover tightly without a gap.
16
Push and hold the cover, and make
sure to pull down the lock lever to the
indicated line.
Power switch
ON