Figure 2–6: Using thin needle-nose pliers to disconnect a fiber optic cable

Installing a Fiber Optic Cable, Switch, or Hub

Use the following steps to install a fiber optic cable connected to either side of a
switch or hub, or to install a switch or hub:
1. If replacing a cable, connect the replacement cable into the ports previously used
by the old cable.
If replacing a switch or hub, reconnect all cables removed from the old switch or
hub.
2. Restart each controller by pressing the reset button.
The controllers automatically restart and the subsystem is now ready for
operation.
IMPORTANT: If a controller did not restart, use step a through step b.
a.
Press and hold the controller reset button.
a.
Reseat the controller program card.
b.
Release the reset button.
3. Restart the host system using host documentation.
HSG80 Array Controller V8.7 Maintenance and Service Guide
Common Replacement Information and Procedures
CXO6613A
2–11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the StorageWorks HSG80 Array Controller V8.7 and is the answer not in the manual?

Questions and answers

Table of Contents