Installing The Controller - HP StorageWorks HSG80 Array Controller V8.7 Maintenance And Service Manual

Hide thumbs Also See for StorageWorks HSG80 Array Controller V8.7:
Table of Contents

Advertisement

Replacement Procedures for BA370 Enclosure Elements
10. If connected to the operational controller, disconnect the PC or terminal from the
controller maintenance port.
11. Disengage both retaining levers and remove the controller, then place the
controller in an antistatic bag or on a grounded antistatic mat.

Installing the Controller

Use the following steps to install the controller in a single-controller configuration.
CAUTION: Carefully align the controller in the Controller A guide rails. Misaligning the
module might damage the backplane.
ESD can easily damage the controller. Wear a snug-fitting, grounded ESD wrist strap.
IMPORTANT: Ensure that the program card is not installed in the replacement controller.
1. Insert the replacement controller into the Controller A bay (see Figure 3–3, 2),
and engage the retaining levers.
2. Connect a PC or terminal to the controller maintenance port.
3. Press and hold the reset button while inserting the program card into the
replacement controller.
4. Release the reset button and install the program card ESD cover on the controller.
5. From the CLI prompt, display details about the configured controller using the
following command:
SHOW THIS_CONTROLLER FULL
6. Refer to the controller CLI reference guide to configure the controller.
NOTE: If the controller being installed was previously used in another subsystem, purge
the controller of the old configuration (refer to the CONFIGURATION RESET command
description in the controller CLI reference guide).
7. Is the current device configuration saved on a disk drive?
No. Manually restore the current device configuration using existing
information and the controller CLI reference guide.
Yes. Automatically restore the configuration, using step a through step d:
IMPORTANT: In the following step, if all port buttons do not begin F
program card is inserted, continue holding the Port #6 button and then eject and reinsert
the program card.
a. Shut down the controller.
3–8
HSG80 Array Controller V8.7 Maintenance and Service Guide
when the
LASHING

Advertisement

Table of Contents
loading

Table of Contents