3. Install the purchased communication card.
4. After the communication card is installed successfully, power on the
2.7.1 USB Interface
When the optional interface card is a stand-alone USB interface (IT-E1209) or
USB+LAN interface (IT-E1206), the following can help users quickly understand
the steps required to connect the USB interface. The figure below shows a typi-
cal USB interface system.
•
•
The operation steps to use the USB interface are as follows.
1. Refer to the USB connection diagram, Connect the power supply and the
2. Select the USB interface type in the system menu.
The above picture is only used to demonstrate the installation process of
the communication box. The actual appearance of the rear panel of the
power supply should be subject to the actual product.
a. Use a screwdriver to unscrew the screws above the communication card.
b. Push the communication card into the instrument slot.
c. Use the screwdriver and screws to lock the instrument and the communi-
cation card.
instrument.
Take the IT-E1209 communication card box as an example. If you install IT-
E1206, please refer to the actual interface position.
The rear panel shown in the figure is only an example. The actual appearance of
the rear panel is subject to the specific instrument.
computer using a cable with two USB interfaces (each end).
a. Press [Shift]+[Display] (System) to enter into the system menu
interface.
Copyright © Itech Electronic Co., Ltd.
Inspection and Installation
26
Need help?
Do you have a question about the IT-M3100D Series and is the answer not in the manual?
Questions and answers