Download Print this page

VETRON 5000 Service Manual page 76

Hide thumbs Also See for 5000:

Advertisement

03. ADJUSTMENT
31.01. ADJUSTMENT OF THE THREAD TAKE UP SPRING TRAVEL / 2-NEEDLE
NOTE:
The thread tension springs
take-up lever top position to needle eye entering into the material.
The thread take up spring movement should be 7mm.
A
DISPLAY
»
ADJUSTMENT OF THE THREAD TAKE UP SPRING TRAVEL
01
02
3
1
T
a eu
k
p
s
p in
r
03
p
o
s
s
e
t p
u
04
05
06
07
05/2019
74
VETRON 5000 - FLAT BED MACHINE - SERVICE MANUAL
should keep the needle thread tight, from the time thread
2
1
2
B
STEP
Activate the ADJUSTMENT WIZARD
(see 02.01. / Page 19).
Until chapter 31 appears on the display.
»
g
»
Confirm.
Loosen screws
1
A
Move the stops
of 7mm to the thread guide
Tighten screws
1
»
Confirm to proceed to the next step.
2
7mm
3
.
B
and
until the thread take up spring
.
3
.
DESCRIPTION
INFO: The pedal is blocked. While
turning by hand the display shows the
machine position in degrees. Stitch
length is set to 0mm.
2
has a distance
2

Advertisement

loading

This manual is also suitable for:

5100