2.
Connect the potential equalization line to the connector of the treatment room.
3.
Connect the numbered inputs in ascending order.
4.
Use the LINK cable to connect the LINK module to the CONNECT module.
5.
Pull back the protection device of the SCB connector and insert the connector into one
of the SCB sockets.
6.
Connect the other end of the cable to a KARL STORZ SCB control device (KARL STORZ
Communication Bus).
Instructions for use • IMAGE1 S • 705LZA_EN_V2.1_05-2022_IFU_FDA
Preparation
25