3. Move hose bundle (A) from the windrower and rest the
bundle on the header.
4. Position the hose support with the lower bolt (A) in
the forward hole and the support positioned as shown.
Loosen both bolts and adjust as required.
5. Route hose bundle (A) from the windrower through the
support (B) on header.
6. Route header return and pressure hose bundle (C)
through support (B) on header to the windrower.
169455
OPERATION
Figure 5.38: Hose Bundle
Figure 5.39: Hose Support
Figure 5.40: Hose Bundle
43
Revision F