Electrical Requirements; 2.4 Electrical Connections - ELECTRO FREEZE FREEDOM 360 Series Operator's Manual

Soft serve twist freezer
Hide thumbs Also See for FREEDOM 360 Series:
Table of Contents

Advertisement

2.2
Installation
Freeze recommends that the freezer be
installed on casters and have flexible
water and electrical connections for
easier service and cleaning.
inch (15 cm) clearance on both side
panels or the rear panel for adequate
ventilation. All freezers are designed with
top air discharge and require that at least
18 inches (45 cm) above the top panel be
free of obstructions. Anything blocking
ventilation of the freezer (including cone
dispensers) will reduce the efficiency of
the freezer.
2.3

Electrical Requirements

tions on the data plate of each freezer.
Data plate specifications will always
supersede the information in this
manual.

2.4 Electrical Connections

wire ampacity and electrical specifica-
tions.
provided for proper power connections.
184621
ELECTRO FREEZE Soft Serve Model 99T-RMT
(continued)
2. Where codes permit, Electro
3. All freezers require a minimum 6
CAUTION
To prevent accidental
electrical shock, a
positive earth ground is
required.
1. Always verify electrical specifica-
CAUTION
To prevent accidental
electrical shock, a
positive earth ground
is required.
1. Check the data plate for fuse size,
2. Refer to the wiring diagram
4. Water cooled models will require
a 3/8 inch MPT water inlet and water
waste connection. The connections are
found on the bottom under the compres-
sor mounting area and are clearly
tagged "Water Inlet" and "Water Waste."
A manual shut-off valve should be
installed in the water inlet line at the time
of installation. Maintain inlet water
pressure above 35 psig (241 kPA) and
below 140 psig (965 kPa) for proper
operation.
5. Place the freezer in the final
location and level by adjusting the legs
or casters so that it is level side-to-side
and the front is approximately ¼ inch (6
mm) lower than the rear to allow proper
drainage of the freezing cylinder.
2. Supply voltage must be within +
10% of voltage indicated on the name-
plate. Also, on three-phase systems,
voltage between phases must be bal-
anced within 2%. (More than a 6 volt
difference between any two voltage
measurements at 208-230 volts indicates
a possible imbalance.) Request your
local power company to correct any
voltage problem.
3. An easily accessible main power
disconnect must be provided for all poles
of the wiring to the freezer.
3. Electrical connections are made
in the junction box located mid-level
behind the left side panel.
4. Use a flexible connection when
permissible. All materials and connec-
tions must conform to local codes and/or
the National Electric Code.
5. For 3 phase freezers, beater
shaft rotation must be clockwise as
viewed from the front of the freezer.
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

99t-rmt

Table of Contents