Maintenance; Maintenance Schedule - KaVo STERIclave B 2200 Operating Instruction

Table of Contents

Advertisement

Operating Instruction STERIclave B 2200 / 2200 P
|

7 Maintenance

7.1 Maintenance schedule

7 Maintenance
Note
KaVo would like to point out that the STERIclave B keeps a record of the number
of sterilisation and maintenance processed completed.
Failure to carry out sufficient or any maintenance operations can lead to premature
defects which will not be covered by the warranty.
▶ Proceed with caution when carrying out cleaning and maintenance work in order
to ensure that the
STERIclave B will continue to operate for the duration of its forecast service life.
7.1 Maintenance schedule
Interval
At the beginning of the
work week.
Every time the unit is swit‐
ched on
Daily
Prior to each sterilisation Clean the instruments carefully
In the event of soiling
After 60 cycles
Every six months or after
400 cycles
Every twelve months or af‐
ter 2000 cycles
After every two years
Note
The measuring point is specified for the safety check.
See also: 7.3.4 Safety check, Page 59
Task
Vacuum test
Automatic self-diagnosis
Bowie&Dick test or Helix test
Clean or replace the fresh water filter
Clean the STERIclave B:
Clean the tray holder and trays
Clean the drain filter
Clean the chamber
Empty the used water tank
Fill the fresh water tank
Dry the chamber
Microbiological tests
Maintenance by a trained engineer
Run a safety check according to VDE 0701-1.
56/78

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stericlave b 2200 p

Table of Contents