Maintenance And Inspection; Maintenance And Inspection Interval - Mitsubishi RV-2F Series Instruction Manual

Table of Contents

Advertisement

5 Maintenance and Inspection

The maintenance and inspection procedures to be carried out to use the robot for a long time without trouble are
described in this chapter. The types and replacement methods of consumable parts are also explained.

5.1 Maintenance and inspection interval

Maintenance and inspection are divided into the inspections carried out daily, and the periodic inspections carry
out at set intervals. Always carry these out to prevent unforeseen trouble, to maintain the product for a long time,
and to secure safety.
(1) Inspection schedule
In addition to the monthly inspection, add the following inspection items every three months (estimated at 500 Hr
operation hours).
0 Hr
500 Hr
1,000 Hr
1,500 Hr
2,000 Hr
6,000 Hr
Operating time
<Guideline for inspection period>
For one shift
8 Hr/day× 20 days/month × 3 months = approx. 500 Hr
10 Hr/day ×20 days/month × 3 months = approx. 600 Hr
For two shifts
15 Hr/day ×20 days/month ×3 months = approx. 1000 Hr
[Caution] When using two lines, the 3-month inspection, 6-month inspection and yearly
inspection must be carried out when half the time has passed.
Fig.5-1 : Inspection schedule
Monthly inspection
Monthly inspection
Monthly inspection
3-month inspection
Monthly inspection
Monthly inspection
Monthly inspection
3-month inspection
Monthly inspection
Monthly inspection
Monthly inspection
3-month inspection
Monthly inspection
Monthly inspection
Monthly inspection
3-month inspection
Monthly inspection
3-month inspection
6-month inspection
6-month inspection
Yearly inspection
6-month inspection
Yearly inspection
Maintenance and inspection interval 5-44
5Maintenance and Inspection
3-year inspection

Advertisement

Table of Contents
loading

Table of Contents