2 Unpacking to Installation
+
+Xw
-
-Zw
WORK coordinate system
ワー ク座標系
Fig.2-17 : WORK jog operation
Confirming the operation
2-23
+Zw
-
+
-Yw
Control point
-Xw
-
+
+Yw
+X
+Z
Tool
length
制御点
* While maintaining the flange surface
posture, the axis moves straight
along the work coordinate system.
Also, while maintaining the flange
surface position, the flange surface
posture changes.
+Y