Installation - Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual

Energy storage system
Table of Contents

Advertisement

Your Smart Energy

2.2 Installation

Step 1: Remove the battery and inverter from the packaging box.
2.2.1
Battery Installation
Figure 11 Battery with Lid off - Front View
Step 2: Open the front cover of the battery and remove the communication wiring
cover (each battery has such a cover on the left and right sides of the case.). Set the
covers aside and close the case.
NOTE: The front cover of the battery should not be opened more than 90°
___________________________________________________________________
Page 16
Installation
Figure 10 Unpacking the inverter and battery
Communication
wiring baffle
Alpha ESS Co., Ltd.
Figure 12 Battery with Lid off – Side View

Advertisement

Table of Contents
loading

Table of Contents