Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 42

Energy storage system
Table of Contents

Advertisement

Your Smart Energy
ADL-3000 three-phase connection (with CT, without meter plug), if applicable:
Figure 47 ADL-3000 three-phase Connect (with CT, without Meter plug)
NOTE: Connect the power meter (PIN 7, 8) to the meter port of the cable box (PIN 3, 6)
using the RJ45 cable.
.
ADL-3000 three-phase connection (with CT, with meter plug), if applicable:
NOTE: To connect the current transformer, connect S1 to L1 and S2 to L1'.
For AC-/ Hybrid-system, there are two meter needed:
Option 1: with Meter Plug
___________________________________________________________________
Page 40
Figure 48 ADL-3000 three-phase Connect (with CT, with Meter plug)
Alpha ESS Co., Ltd.
Installation
Option 2: without Meter Plug

Advertisement

Table of Contents
loading

Table of Contents