Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 21

Energy storage system
Hide thumbs Also See for Storion-SMILE5:
Table of Contents

Advertisement

Your Smart Energy
Installation
Debris Baffle, drill φ8, depth about 70 mm
Figure 16 Battery Installation - Drill Holes
Step 6: Position the battery parallel to the wall and use a Φ8mm drill to drill holes at a
depth of about 70mm in the wall for subsequent fixation of the mounting plates.
NOTE: Place a cover (paper, foil, etc.) over the battery while drilling into the wall to
protect it from dust. In addition, at the place of installation, the slope of the ground on a
horizontal plane may not exceed 3° .
M6 Gasket
φ8*60
Figure 17 Battery Installation – Mounting on the Wall
Step 7: Remove the debris baffle and secure the battery to the wall with screws and
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 19

Advertisement

Table of Contents
loading

Table of Contents