Your Smart Energy
NOTE: In Australia and New Zealand, please find the earthing point on the
right side of the battery and connect the earthing point of all of the batteries to
the ground refer to AS 3000.
Step 20: Close the battery covers and connect the PV-MC4 connectors to the system
(connection on both sides). Also, connect all AC cables, the meter communications
cable METER, and the Ethernet cable LAN. Then close the cable box cover.
The installation is now complete.
___________________________________________________________________
Page 32
Installation
Figure 32 PV Wiring
Alpha ESS Co., Ltd.
4*MC4