Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 39

Energy storage system
Table of Contents

Advertisement

2.3.1.1 Single-phase in house
ADL-3000 single-phase connection (without CT, without meter plug), if applicable:
Figure 41 ADL-3000 single-phase Connect (with CT, without Meter Plug)
NOTE: Connect the power meter (PIN 7, 8) to the meter port of the cable box (PIN 3, 6)
using the RJ45 cable.
ADL-3000 single-phase connection (without CT, with meter plug), if applicable:
Figure 42 ADL-3000 single-phase Connect (without CT, with Meter plug)
___________________________________________________________________
Installation
LOAD
LOAD
Alpha ESS Co., Ltd.
Your Smart Energy
Page 37

Advertisement

Table of Contents
loading

Table of Contents