Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 25

Energy storage system
Table of Contents

Advertisement

Object
A
B
C
D
Step 13-2: Assemble the AC connector and connect the conductor to the AC
connector
Step 13-3: Ensure that all conductors are securely connected to the AC connector.
Step 13-4: Plug the AC connector into the jack for the AC connection.
a. Parts are equipped with cables
b. Crimp the wire according to the position shown, tighten the screw torque0.8±
0.1N·m.
PE
L
Male
N
c. The plastic core is screwed into the body
___________________________________________________________________
Installation
Description
External diameter
Conductor cross-section
Stripping length of the insulated
conductors
Stripping length of the outer
sheath of the AC cable
Sealing body
Main part
Insert the cables into
the corresponding Pin
holes and tighten the
screws with the
screwdrivers.
Female
Alpha ESS Co., Ltd.
Your Smart Energy
Value
8 mm to 14 mm
2.5 mm² to 4 mm²
approx.6.5mm
approx. 30 mm (Backup)
approx.30mm (Grid L and N)
approx.35mm (Grid PE)
Lock nut
Line male
Page 23

Advertisement

Table of Contents
loading

Table of Contents