Choose The Battery Model - Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual

Energy storage system
Hide thumbs Also See for Storion-SMILE5:
Table of Contents

Advertisement

Your Smart Energy
The installer will be asked to input corresponding information as the picture shown below when he
starts commissioning a new site, including the SN, Check Code, Liscense No. And so on.

5.5 Choose the Battery Model

___________________________________________________________________
Page 60
Commissioning
Login the installer account and choose Storage
System Maintenance> "Install new system" to
register a new system at Alpha ESS.
Alpha ESS Co., Ltd.

Advertisement

Table of Contents
loading

Table of Contents