Alpha ESS M4856-S Quick Installation Manual
Alpha ESS M4856-S Quick Installation Manual

Alpha ESS M4856-S Quick Installation Manual

Hide thumbs Also See for M4856-S:

Advertisement

Quick Links

Quick Installation Manual
M4856-S&HV50056

Advertisement

Table of Contents
loading

Summary of Contents for Alpha ESS M4856-S

  • Page 1 Quick Installation Manual M4856-S&HV50056...
  • Page 2: Packing List

    Packing List M4856-S Screw package: Battery pack (X 1) PE Protective bag ( X 1) Screw M5*10 (X 4) Gasket (X 4) Bracket (X 2) Expansion tube (X 4) Expansion screw (X 4) Battery connector: Battery communication line (X 1)
  • Page 3: Open The Package

    Open The Package Disassemble Appearance Parts Step1 Step2 Note: the packaging box must be placed in accordance with the marking Pull out the buckle from Pull the top two guide rods direction. Taking the packaging upside or in other direction are not allowed. the bottom in the middle.
  • Page 4 Expansion tube (X 4) Insert the expansion screw through the gasket and Expansion screw (X 4) Gasket (X 4) lock with a screwdriver. M4856-S can be stacked with max. 4 batteries in each row. To install additional battery repeat step 2 -4.
  • Page 5 Packing List HV50056 Screw package: Battery connector: Expansion tube (X 5) Positive power line (X 1) HV50056 BOX ( X 1) RJ45 Connectors ( X 1) Expansion screw (X 5) Negative power line (X 1) Gasket (X 5) Terminal Resistance (X 1) Cable Bond (X 1) Hexagon nuts with flange (X 4)
  • Page 6: Connecting The Power Cable

    Disassemble Appearance Parts Step6 Take the HV50056 out of the packaging box. Pull out the top two guide rods and then remove the front panel. Remove the rear bracket from the HV50056. Connecting The Power Cable Step7 Fix the HV50056 rear bracket with flange nuts onto the two hangers of the battery. Hexagon nuts with flange (X 4)
  • Page 7: Mounting Bracket

    Mounting Bracket Step8 Use impact drill (bit φ 8.0mm, length 20cm) to directly drill at the marking positions of the hangers and the hole depth should be about 7 cm. Screw package: Note:Pack the PE bag on Expansion tube (X 3) Gasket (X 3) the battery to prevent dust Expansion screw (X 3)
  • Page 8 Connect Power Line Connect Power Line Step11 Step11 BAT+ BAT- Battery power cable connection sequence: Through the waterproof cap→through the seal ring→through the joint. Then fix the cable to the copper bar with M5 nut. Connect Communication Line Step12 Terminal Resistance Use a screwdriver to remove the maintenance HV50056 &...
  • Page 9: Dip Switch

    Connect Power Line DIP Switch Step12 Step13 DIP switch: DIP switch defines the ID address of each battery in one cluster. Set the DIP switch of the battery that is closest to the HV50056 as 1 and the farthest as N. N is the total number of the batteries, which is min.
  • Page 10 Alpha ESS Co., Ltd. Headquarter: Alpha ESS Co., Ltd. Germany: Alpha ESS Europe GmbH Australia: Alpha ESS Australia Pty. Ltd. Italy: Alpha ESS Italy S.r.l. +86 (0) 513 806 068 91 +49 (0) 6103 / 459 160-1 +61 (0) 402 500 520...