Step 10: Hang the inverter onto the wall bracket, adjust the entire system and ensure
that the battery and the inverter have been securely hung onto the panels and
brackets.
2.2.3
DRMs
If DRM support is specified, the system may only be used in conjunction with a Demand Response
Enabling Device (DRED). This ensures that the system im-plements the commands from the grid
operator for active power limitation at all times. The system and the Demand Response Enabling Device
(DRED) must be connected in the same network. Only DRM0 is available for SMILE5 system.
RJ45 Pin
1
2
3
4
5
6
7
8
___________________________________________________________________
Installation
Figure 27 Inverter Installation on the Wall
MODE
DRM4
DRM5
DRM1
DRM2
DRM3
DRM0
N/A
Ref Gen
Alpha ESS Co., Ltd.
Your Smart Energy
View
Page 27