Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 41

Energy storage system
Table of Contents

Advertisement

Your Smart Energy
Installation
2.3.1.2 Three-phase in house
ADL-3000 three-phase connection (without CT, without meter plug), if applicable:
Figure 45 ADL-3000 three-phase Connect (without CT, without Meter plug)
NOTE: Connect the power meter (PIN 7, 8) to the meter port of the cable box (PIN 3, 6)
using the RJ45 cable.
.
ADL-3000 three-phase connection (without CT, with meter plug), if applicable:
Figure 46 ADL-3000 three-phase Connect (without CT, with Meter plug)
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 39

Advertisement

Table of Contents
loading

Table of Contents