2.3 Power Meter Wiring
The electricity meter should be mounted and connected at the grid transition point (feed-in point) so
that it can measure the grid reference and feed-in power. Alpha ESS currently provides 4 different
power meter solutions:
➢
ADL-3000: three-/ single-phase meter (with or without CT)
➢
SM60A: single-phase meter
➢
Backup Box: three-/ single-phase meter (Contain off-grid switching and load
management)
➢
ACR10R: Three-phase CT electric meter
Model
ADL3000-N/CT & 300A/5A CT
ADL3000-N/CT & 400A/5A CT
ADL3000-N/CT & 400A/1A CT
ACR10R-200A CT
ACR10R-120A CT
2.3.1
Meter SM60A (If Applicable)
___________________________________________________________________
Installation
Figure 36 Hybrid-coupled system
Table 1 CT meter ratio and accuracy table
CT ratio
60
80
400
200
120
Alpha ESS Co., Ltd.
Your Smart Energy
Accuracy
0.6 kWh
0.8 kWh
4.0 kWh
2.0 kWh
1.2 kWh
Page 35