5.9 Check after commissioning

The enduser can login their account and check the settings & firmware version after commissioning
at following interface .

6. Routine Maintenance

6.1 Maintenance Plan & checklist
Check if wire connections are loose.
Check if cables are aged/damaged.
Check if cable insulating ribbon drops.
Check if cable terminal screw loose, any overheat sign.
Check if ground connection is well.