Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 38

Energy storage system
Hide thumbs Also See for Storion-SMILE5:
Table of Contents

Advertisement

Your Smart Energy
Installation
2.3.1.1 SM60A connect (with meter plug), if applicable:
LOAD
Figure 37 SM60A connect (with meter plug)
2.3.1.2 SM60A connect (without meter plug), if applicable:
LOAD
Figure 38 SM60A connect (without meter plug)
NOTE: Connect the power meter (PIN 5, 6) to the meter port of the cable box (PIN 3, 6)
using the RJ45 cable.
For AC/Hybrid system, there are two meter needed:
Option 1: with Meter Plug
Option 2: without Meter Plug
Figure 39 Two Meter Connect, with Meter Plug
Figure 40 Two Meter Connect, without Meter
Plug
2.3.2
Meter ADL-3000 (If Applicable)
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 36

Advertisement

Table of Contents
loading

Table of Contents