Your Smart Energy
gaskets.
Step 8: To assemble the second (and all other) battery, repeat steps 6 and 7,
respectively.
Step 9: Take out the inverter position plate and the wall bracket and connect them
using the M4 nuts as shown above. Check carefully if everything is tight.
___________________________________________________________________
Page 20
Figure 18 Battery Installation – Second Battery Installation
Figure 19 Wall Bracket Installation
Alpha ESS Co., Ltd.
Installation