Setup The Ups - Delta INX Series User Manual

Table of Contents

Advertisement

2.2 Setup the UPS

Before installing the UPS, please read below to select proper location to install
UPS.
1.UPS should be placed on the flat and clean surface. Place it in an area away
from vibration, dust, humidity, high temperature, flammable liquids, gases,
corrosive and conductive contaminants. Install the UPS indoors in a clean
environment, where it is away from window and door. Maintain minimum
clearance of 100mm in the bottom of the UPS to avoid dust and high
temperature.
2. Maintain an ambient temperature range of 0ºC to 45ºC for UPS optimal
operation. For every 5ºC above 45ºC, the UPS will derate 12% of nominal
capacity at full load. The highest working temperature requirement for UPS
operation is 50ºC.
3. It's required to maintain maximum altitude of 1000m to keep UPS normal
operation at full load UPS. If it's used in high altitude area, please reduce
connected load. Altitude derating power with connected loads for UPS normal
operation is listed as below:
Amplon INX Series
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inx-1kInx-2kInx-3k

Table of Contents