Page 1
IBM System Storage SAN Volume Controller Version 6.4.0 Model 2145-CG8 Hardware Installation Guide GC27-3923-02...
Page 2
Before using this information and the product it supports, read the general information in “Notices” on page 65, the information in the “Safety and environmental notices” on page ix, as well as the information in the IBM Environmental Notices and User Guide , which is provided on a DVD.
SAN Volume Controller 2145-CG8 controls and indicators . . 53 Chapter 2. Installing the SAN Volume Node status LED . 53 Controller 2145-CG8 hardware ..7 Front-panel display . . 54 Preparing for the hardware installation Navigation buttons . . 54...
Page 4
Avis de conformité à la réglementation Index ....77 d'Industrie Canada . . 68 Australia and New Zealand Class A Statement SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
A four-node SAN Volume Controller system Installing the SAN Volume Controller with the redundant ac-power switch feature . 2145-CG8 node in the slide rails of the rack . . 35 Parts provided for SAN Volume Controller Raising the SAN Volume Controller 2145-CG8 2145-CG8 hardware installation in a rack .
Page 6
SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
SAN Volume Controller library. . xxi Physical specifications . . 48 Other IBM publications . . xxii Environment requirements with redundant ac IBM documentation and related websites xxiii power . . 48 Cable-management arm and associated parts Dimensions and weight . 49 descriptions and quantities .
Page 8
SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
A danger notice indicates the presence of a hazard that has the potential of causing death or serious personal injury. (D002) 2. Locate IBM System Storage SAN Volume Controller Safety Notices with the user publications that were provided with the SAN Volume Controller hardware.
Page 10
After service, reinstall all safety shields, guards, labels, and ground wires. Replace any safety device that is worn or defective. v Reinstall all covers correctly after you have finished servicing the unit. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Electrical voltage and current from power, telephone, and communication cables are hazardous. To avoid a shock hazard: v Connect power to this unit only with the IBM provided power cord. Do not use the IBM provided power cord for any other product.
Page 12
Do not service the following parts with the power on when they are removed from their normal operating places in a device. (This practice ensures correct grounding of the units.) – Power supply units – Pumps – Blowers and fans SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
About this task Each device has required safety items installed to protect users and IBM service personnel from injury. This guide addresses only those items. Important: Good judgment must also be used to identify potential safety hazards due to the attachment of non-IBM features or options not covered by this inspection guide.
To conduct the internal device check, perform the following steps: Procedure 1. Check for any non-IBM changes that might have been made to the device. If any are present, obtain the “Non-IBM Alteration Attachment Survey,” form number R009, from the IBM branch office. Complete the form and return it to the branch office.
Procedure 1. Ensure that the SAN Volume Controller node is powered off. See MAP 5350: Powering off a SAN Volume Controller node in the IBM System Storage SAN Volume Controller Troubleshooting Guide. 2. If the uninterruptible power supply is a 2145 UPS, ensure that other SAN Volume Controller nodes that are powered from the uninterruptible power supply are powered off.
Consider the following conditions and their potential safety hazards: Electrical hazards (especially primary power) Primary voltage on the frame can cause serious or lethal electrical shock. Explosive hazards A bulging capacitor can cause serious injury. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Mechanical hazards Loose or missing items (for example, nuts and screws) can cause serious injury. About this task Use caution when working in a potential safety hazard that is not covered in the safety checks. If unsafe conditions are present, determine how serious the hazards are and whether you can continue before you correct the problem.
Product recycling and disposal Ensure that you are aware of the materials that must be recycled. Before using this information and the product that it supports, read the IBM Environmental Notices and User Guide on the IBM Environmental Notices CD.
This document also contains additions and corrections to procedures for installing the rails for the SAN Volume Controller 2145-CG8 node in a rack. A section provides procedures for installing the uninterruptible power supply (2145 UPS-1U) in a rack.
SAN Volume Controller library Unless otherwise noted, the publications in the SAN Volume Controller library are available in Adobe portable document format (PDF) from the following website: www.ibm.com/storage/support/2145 SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Each of the PDF publications in Table 1 is available in this information center by clicking the number in the “Order number” column: Table 1. SAN Volume Controller library Title Description Order number IBM System Storage SAN This guide provides the GC27-3923 Volume Controller Model instructions that the IBM 2145-CG8 Hardware...
License Z125-5468) Agreement for Machine Code for the SAN Volume Controller product. Other IBM publications Table 2 lists IBM publications that contain information related to the SAN Volume Controller. Table 2. Other IBM publications Title Description Order number...
Adobe website: www.adobe.com/support/downloads/main.html How to order IBM publications The IBM Publications Center is a worldwide central repository for IBM product publications and marketing material. The IBM Publications Center offers customized search functions to help you find the publications that you need. Some publications are available for you to view or...
You can also order publications. The publications center displays prices in your local currency. You can access the IBM Publications Center through the following website: www.ibm.com/e-business/linkweb/publications/servlet/pbi.wss Sending your comments To submit any comments about this book or any other SAN Volume Controller...
Planning tasks to complete before installing the SAN Volume Controller Before you install the SAN Volume Controller, you must complete the following planning tasks or have them completed by an IBM service representative or IBM Business Partner: 1. Verify that all the SAN Volume Controller installation requirements have been met.
Page 26
You can save, edit, and share the charts and tables between members of the installation team. For the SSPC, complete the planning worksheet in the Appendix of the IBM System Storage Productivity Center Introduction and Planning Guide. You can also obtain the planning work sheet from the following website: publib.boulder.ibm.com/infocenter/tivihelp/v4r1/index.jsp...
Page 27
System_Storage/Storage_software/Storage_infrastructure_management/ System_Storage_Productivity_Center_(SSPC)/ 3. Configure the optional SSPC. The IBM System Storage Productivity Center User's Guide describes how to configure the SSPC for the SAN Volume Controller. 4. Create a SAN Volume Controller system. The IBM System Storage SAN Volume Controller Software Installation and Configuration Guide describes this procedure, which is completed in two phases: a.
Page 28
SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Minimum of one pair of SAN Volume Controller nodes v Minimum of two uninterruptible power supply units v One optional IBM System Storage Productivity Center per SAN installation for configuration SAN Volume Controller 2145-CG8 node features...
You must properly cable the redundant ac-power switch units in your environment. Note: While this topic provides an example of the cable connections, it does not indicate a preferred physical location for the components. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Figure 2 shows an example of the main wiring for a SAN Volume Controller clustered system with the redundant ac-power switch feature. The four-node clustered system consists of two I/O groups: v I/O group 0 contains nodes A and B v I/O group 1 contains nodes C and D Figure 2.
2145 UPS-1U, as shown by node A and node B. The SAN Volume Controller 2145-CG8 is an example of a node that has two power supplies. The SAN Volume Controller 2145-8A4 is an example of a node that has a single power supply.
Page 33
If a redundant ac-power switch is not used, the two uninterruptible power supplies that power an I/O group can be connected to different, independent electrical power sources. In this case, if a single power source fails, only one node in the I/O group stops and the SAN Volume Controller system can continue to operate, although with reduced performance.
Page 34
SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware There are several steps that you must perform to prepare, and then install the SAN Volume Controller hardware. Before you begin To install the SAN Volume Controller hardware, perform the following tasks in order.
Figure 3. Parts provided for SAN Volume Controller 2145-CG8 hardware installation in a rack 1 SAN Volume Controller node 2 SAN Volume Controller support rails (2) 3 2145 UPS-1U 4 2145 UPS-1U support rails (2) 5 Power cable assembly 6 SAN Volume Controller cable-management support arm...
Page 37
Feature code 0010: initial SAN Volume Controller 2145-CG8 software preinstalled on feature code 3001 and 3002 v One of the following: – Feature code 3001: initial SAN Volume Controller 2145-CG8 node, quantity – Feature code 3002: additional SAN Volume Controller 2145-CG8 node, quantity 1...
Page 38
Feature codes 3001 and 3002 ship the same parts. Verify that you have the listed parts: – SAN Volume Controller 2145-CG8 node – Part number 69Y1365: SAN Volume Controller 2145-CG8 Support rail kit, quantity 1 – Part number 69Y1366: SAN Volume Controller 2145-CG8 Cable-management arm assembly, quantity 1 –...
Page 39
The part numbers listed here might not always reflect what the customer has received. 4. Read “Safety and environmental notices” on page ix to ensure that you are correctly installing the 2145 UPS-1U units. Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
Attaching the mounting plates to the redundant ac-power switch Attach the mounting plates to the redundant ac-power switch before you label the cables. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
You will find it easier to connect the input-power cables to the redundant ac-power switch before you install the redundant ac-power switch in the rack. About this task Perform the following steps to connect the input-power cables to the redundant ac-power switch: Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
2. Position the four “C” clips in the rack's mounting bar, as shown in Figure 6 on page 15. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
2. Route the main input-power cable of the redundant ac-power switch to the specified power distribution unit, and connect it. 3. Route the backup input-power cable of the redundant ac-power switch to the specified power distribution unit, and connect it. Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
1. 6. Reconnect the backup power cable and remove the monitoring device. Note: After any failure, repeat the test phase from the start until all the tests succeed. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
3. Attach the long side of a mounting bracket 1 to each side of the 2145 UPS-1U using four M3 × 6 screws 2 for each bracket, as shown in Figure 8 on page Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
The figure shows the rear rail where the 2145 UPS-1U attaches to the rack. See Figure 10 on page 19. Note: The bottom flange of the support rail must align with the EIA mark on the rack. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
The rack might be different from the one shown here, and if so, might require different clip nuts or fasteners. Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
Use the reference numbers in parentheses at the end of each safety notice to find the matching translated notice. For the translation of the danger, caution, and attention notices, see the IBM Systems Safety Notices. CAUTION: The uninterruptible power supply contains its own energy source (sealed, lead-acid batteries).
3. If you have not already connected the internal battery connector, remove the 2145 UPS-1U front panel, shown in “Installing the 2145 UPS-1U in the rack” on page 20, by pulling the panel forward (1), then pushing to the left (2). Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
Note: A small amount of arcing might occur when connecting the batteries. This is normal and does not damage the unit or present any safety concerns. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Volume Controller clustered system will malfunction. 8. Press and hold the on/off button ( 7 in Figure 17 on page 24) for approximately five seconds. You might need a pointed device, such as a Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
1. Install the power cable into the rightmost power outlet on the rear of the 2145 UPS-1U. 2. Remove the bracket and the two screws (shown in Figure 18 on page 25) from the packaging. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
There are several steps that you must perform to install the SAN Volume Controller 2145-CG8 node. About this task Installing the SAN Volume Controller 2145-CG8 consists of the following tasks: 1. Installing the support rails in the rack cabinet. 2. Installing the SAN Volume Controller 2145-CG8 node.
Installation guidelines Before you install the support rails for the SAN Volume Controller 2145-CG8 node, review the following guidelines: Before you begin v Do not install a unit in a rack where the internal-rack ambient temperature exceeds the lowest manufacturer-recommended ambient temperature for all of your rack-mounted devices.
Note: You might find it helpful, with some types of racks, to remove the rack doors and side panels to provide easier access during installation. 2. Open the rear-slide-rail hooks, as shown in Figure 21 on page 28. Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
6. Install the other rail in the same manner. Installing the cable-management arm for the SAN Volume Controller 2145-CG8 The SAN Volume Controller 2145-CG8 uses a cable-management arm to route and secure power and communication cables. Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
The parts involved in installing the cable-management arm are shown in Figure 25. Cable management arm kit Friction rail kit Figure 25. SAN Volume Controller 2145-CG8 cable-management arm, support rails, and associated parts Table 5. Cable-management arm and associated parts descriptions and quantities Reference...
Figure 26. Installing the cable-management-support arm 2. Install the cable management arm, as shown in Figure 27 on page 32. Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
Push the tabs until they snap into place. 3. Adjust the location of the cable management arm, as shown in Figure 28 on page 33. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Secure the cables with cable ties or hook-and-loop fasteners. Note: Leave some slack in all of the cables to avoid tension in the cables as the cable-management arm moves. Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware...
About this task To install the SAN Volume Controller 2145-CG8 node in the rack, perform the following steps: Procedure 1. Place the SAN Volume Controller 2145-CG8 in the rails on the rack.
Verify that the front latch 5 slides over the nail heads. Figure 30. Installing the SAN Volume Controller 2145-CG8 node in the slide rails of the rack 2. Lift the locking levers on the slide rails and push the node 2 all the way into the rack until it clicks into place.
31P1294, that was supplied with the node. Power cable assemblies that were supplied with previous SAN Volume Controller models do not work with the 2145-CG8 model because there are two power cables in the bundle for the 2145-CG8 model. The correct part is differentiated by the blue tape that binds the cables together.
4. Place the other end of the signal cable into the communication port 6 on the 2145 UPS-1U. Results The SAN Volume Controller 2145-CG8 power is now connected to the 2145 UPS-1U. Installing the SAN Volume Controller 2145-CG8 cable-retention brackets Two power cords run from the uninterruptible power-supply to each of the two SAN Volume Controller 2145-CG8 power supplies.
If only one cable is connected, the cable must be connected to Ethernet port 1. About this task To connect the SAN Volume Controller 2145-CG8 to the SAN and to the Ethernet network, perform the following steps: Procedure 1.
7 Serial connection for UPS communication cable 8 Ethernet port 2 9 Ethernet port 1 Figure 35. 10 Gbps Ethernet ports on the rear of the SAN Volume Controller 2145-CG8 1 10 Gbps Ethernet port 3 2 10 Gbps Ethernet port 4...
The SAN Volume Controller 2145-CG8 runs an extended series of power-on self tests. The node might appear to be idle for up to five minutes after powering on. Figure 36 illustrates the controls and indicators on the front panel that verify the installation.
Figure 38 shows how the node number is displayed on the front panel. If the node number is not the same, contact the IBM Support Center.
Page 70
11. Check whether the second line of the front-panel display shows the message Active. If Active is not shown on the second line, go to MAP 5600: Fibre Channel in the IBM System Storage SAN Volume Controller Troubleshooting Guide to repair the fault.
Page 71
The installation of the SAN Volume Controller hardware is now complete. No software installation is required. Continue with the instructions in the IBM System Storage SAN Volume Controller Software Installation and Configuration Guide to create, if necessary, a new SAN Volume Controller clustered system and to add the nodes into a SAN Volume Controller system.
Page 72
SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
This feature is documented in the topic that discusses initiating cluster (system) creation from the front panel, which is located in the IBM System Storage SAN Volume Controller Information Center and the IBM System Storage SAN Volume Controller Software Installation and Configuration Guide.
Page 74
– Press Tab to navigate to the fields that are available for editing. – Type your edit and press Enter to issue the change command. Accessing the publications You can find the HTML version of the IBM System Storage SAN Volume Controller information at the following website: publib.boulder.ibm.com/infocenter/svc/ic/index.jsp You can access this information using screen-reader software and a digital speech synthesizer to hear what is displayed on the screen.
Appendix B. SAN Volume Controller physical installation planning Before the IBM service representative can set up your SAN Volume Controller environment, you must verify that the prerequisite conditions for SAN Volume Controller, the uninterruptible power supply, and optional redundant ac-power switch installation are met.
5% to 100% 29°C (84°F) (-4°F to 140°F) (0 ft to 34991 ft) condensing, but no precipitation Preparing your environment The following tables list the physical characteristics of the SAN Volume Controller 2145-CG8 node. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Cable exit Maximum heat output of each SAN Volume Controller 2145-CG8 node The node dissipates the following maximum heat output. Table 11. Maximum heat output of each SAN Volume Controller 2145-CG8 node Model Heat output per node SAN Volume Controller 2145-CG8...
The following tables describe the physical characteristics of the 2145 UPS-1U. 2145 UPS-1U dimensions and weight Ensure that space is available in a rack that is capable of supporting the 2145 UPS-1U. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Height Width Depth Maximum weight 44 mm 439 mm 579 mm 16 kg (1.73 in.) (17.3 in.) (22.8 in.) (35.3 lb) Note: The 2145 UPS-1U package, which includes support rails, weighs 18.8 kg (41.4 lb). Heat output The 2145 UPS-1U unit produces the following approximate heat output. Heat output during normal Heat output during battery Model...
Page 80
39M5130 Israel 2.8 m (9 ft) SI 32 39M5172 Liechtenstein, Switzerland 2.8 m (9 ft) IEC 60884 Stnd. 39M5158 Sheet 416534?2 (CH Type 12) Thailand 2.8 m (9 ft) NEMA 6-15P 39M5095 SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Figure 40 shows the controls and indicators on the front panel of the SAN Volume Controller 2145-CG8. Figure 40. SAN Volume Controller 2145-CG8 front panel 1 Node-status LED 2 Front-panel display 3 Navigation buttons...
The operator-information panel contains buttons and indicators such as the power-control button, and LEDs that indicate information such as system-board errors, hard-drive activity, and power status. Figure 41 on page 55 shows the operator-information panel for the SAN Volume Controller 2145-CG8. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Note: See MAP 5800: Light path to help you isolate the faulty FRU. Release latch The release latch on the SAN Volume Controller 2145-CG8 gives you access to the light-path diagnostics panel, which provides a method for determining the location of a problem.
The select button and navigation buttons help you to navigate and select menu and boot options, and start a service panel test. The select button is located on the front panel of the SAN Volume Controller, near the navigation buttons. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Figure 43 shows the rear-panel indicators on the SAN Volume Controller 2145-CG8 back-panel assembly that has the 10 Gbps Ethernet feature. Figure 43. SAN Volume Controller 2145-CG8 rear-panel indicators for the 10 Gbps Ethernet feature 1 10 Gbps Ethernet-link LEDs. The amber link LED is on when this port is connected to a 10 Gbps Ethernet switch and the link is online.
The ac, dc, and power-supply error LEDs indicate whether the node is receiving electrical current. Figure 44 shows the location of the SAN Volume Controller 2145-CG8 ac, dc, and power-supply error LEDs. Figure 44. SAN Volume Controller 2145-CG8 or 2145-CF8 ac, dc, and power-error LEDs Each of the two power supplies has its own set of LEDs.
Page 87
The operator-information panel LEDs refer to the Ethernet ports that are mounted on the system board. If you install the 10 Gbps Ethernet card on a SAN Volume Controller 2145-CG8, the port activity is not reflected on the activity LEDs. Appendix C. SAN Volume Controller hardware controls, indicators, and connectors...
7 Serial connection for UPS communication cable 8 Ethernet port 2 9 Ethernet port 1 Figure 46. 10 Gbps Ethernet ports on the rear of the SAN Volume Controller 2145-CG8 1 10 Gbps Ethernet port 3 2 10 Gbps Ethernet port 4 Figure 47 on page 61 shows the type of connector that is located on each power-supply assembly.
Figure 47. Power connector SAN Volume Controller 2145-CG8 ports used during service procedures The SAN Volume Controller 2145-CG8 contains a number of ports that are only used during service procedures. Figure 48 shows ports that are used only during service procedures.
The physical port numbers are 1 - 4, counting from the left side to the right side when you view the rear panel of the SAN Volume Controller 2145-CG8. Figure 50 provides a view of the rear of the SAN Volume Controller 2145-CG8. Figure 50. Physical Fibre Channel port numbers for the SAN Volume Controller 2145-CG8...
7 On/off button 8 Test and alarm reset button Load segment 2 indicator The load segment 2 indicator on the 2145 UPS-1U is lit (green) when power is available to load segment 2. When the load segment 2 indicator is green, the 2145 UPS-1U is running normally and power is available to this segment.
Use the test and alarm reset button to start the self-test. To start the self-test, press and hold the test and alarm reset button for three seconds. This button also resets the alarm. SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Web sites. The materials at those Web sites are not part of the materials for this IBM product and use of those Web sites is at your own risk.
Page 94
IBM may use or distribute any of the information you supply in any way it believes appropriate without incurring any obligation to you. Licensees of this program who wish to have information about it for the purpose of enabling: (i) the exchange of information between independently created...
IBM, therefore, cannot guarantee or imply reliability, serviceability, or function of these programs. The sample programs are provided "AS IS", without warranty of any kind. IBM shall not be liable for any damages arising out of your use of the sample programs.
Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. IBM is not responsible for any radio or television interference caused by using other than recommended cables and connectors, or by unauthorized changes or modifications to this equipment. Unauthorized changes or modifications could void the user's authority to operate the equipment.
Klasse A ein. Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung der IBM verändert bzw.
This apparatus is manufactured to the International Safety Standard EN60950 and as such is approved in the U.K. under approval number NS/G/1234/J/100003 for indirect connection to public telecommunications systems in the United Kingdom. Korean Communications Commission (KCC) Class A Statement SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
2145 UPS-1U 24 panel 62 cable retention brackets danger notices environment 50 SAN Volume Controller 2145-CG8 37 2145 UPS-1U 35 heat output of node 49 cable-management arm redundant ac power switch 12 installation steps 17...
Page 106
54 LEDs 59 operator information SAN Volume Controller 2145-CG8 labeling cables 13 SAN Volume Controller Ethernet activity LED 59 LEDs 2145-CG8 54 information ac and dc 58 center xx SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Page 107
51 release latch 56 charts and tables 7 redundant ac-power switch 51 ports 60 tables and charts 7 SAN Volume Controller 2145-CG8 47 power requirements for each planning for SAN Volume Controller uninterruptible power supply xvii node 47 installation 47...
Page 108
50 preparing for installation 7 United Kingdom electronic emission notice 70 unused ports SAN Volume Controller 2145-CG8 61 verifying installation SAN Volume Controller 2145-CG8 39 who should read this guide xix SAN Volume Controller: Model 2145-CG8 Hardware Installation Guide...
Page 110
Part Number: 31P1669 Printed in USA GC27-3923-02...
Need help?
Do you have a question about the 2145-CG8 and is the answer not in the manual?
Questions and answers